My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01455
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:06:20 PM
Creation date
10/4/2006 10:02:53 PM
Metadata
Fields
Template:
Floodplain Documents
County
Costilla
Community
San Luis
Stream Name
San Luis area drainageway
Title
Contract Documents for Subdrain and Levee Improvements
Date
6/18/1990
Prepared For
San Luis
Prepared By
WRC Engineering, Inc.
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IB-17 Time of Contract. The time of the contract shall be ninety calendar <br />days (90) from the date of the Notice to Proceed. Time for extension <br />due to weather shall be as defined in the General Contract Conditions. <br /> <br />IB-18 Compliance with the Provisions of Training, Employment and Business <br />Opportunities. The work to be performed under this contract is on a <br />project assisted under a program providing federal financial assistance <br />from the Department of Housing and Urban Development through the State <br />of Colorado and is subject to the requirements of Section 3 of the <br />Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u. <br />Section 3 required that, to the greatest extent feasible, opportunities <br />for training and employment be given lower income residents of the <br />project area, and contracts for work in connection with the project be <br />awarded to business concerns which are located in or owned in <br />substantial part by persons residing in the project area. The <br />Affirmative Action Plan as adopted by the Town of San Luis, dated <br />3/21/90, shall be a part of this contract and shall be complied with in <br />all aspects. <br /> <br />IB-19 B i dde rs attention is di rected to an Alternate Bi d for Bi d Items A-I, <br />A-2, and A-3. Prices shall be in accordance with the instructions in <br />PRICES TO INCLUDE section. OWNER shall have the right to select which <br />of the bi d i terns is in thei r best interest. <br /> <br />IB-20 Permits. Contractor shall include costs of purchasing and obtaining all <br />necessary permits in bid prices. <br /> <br />IB-21 DAVIS BACON ACT. The successful bidder shall comply with all provisions <br />of the Davis Bacon Act, including the General Wage Decision No. C090-1 <br />included in Part V, Subsection 6. <br /> <br />111-4 <br /> <br />(1667-3/90) <br />
The URL can be used to link to this page
Your browser does not support the video tag.