My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01454
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:09:18 PM
Creation date
10/4/2006 10:02:51 PM
Metadata
Fields
Template:
Floodplain Documents
County
Mesa
Community
Grand Junction
Stream Name
Colorado River
Title
Colorado River Flood Analysis - A Proposal for Engineering Services
Date
11/1/1983
Prepared For
Grand Junction
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />significant impact will be reviewed. Approximately fifteen facilities have <br />been identified in our initial review, <br /> <br />Products - The following is a list of items for use by the County and CHy that <br />wi 11 be deve I op ed as p art of the above task s: <br /> <br />. A revised map showing the 100-yectr and SOO--year floodp lains and the 100- <br />year floo.dway under existing conditions. <br /> <br />. Water surface profiles showing the 10-, 50-, 100-, and SOD-year events, <br /> <br />. A map showing the extent of inundation for' increasing flow magnitudes as <br />banks or levees are overtopped along the reach. <br /> <br />. A table providing a summary of properties inundated in each area as flood <br />magnitudes increase, i.e., a tabul11tion of the number of res'identia'l and/or <br />commercial properties and any other facil ities that would be affected by <br />flooding. <br /> <br />. <br /> <br />Presentat i on of recommended des i gn cr iter i a for <br />temporary levees constructed along the river. <br />recommendations on top width, compaction, freeboard, <br />protection. <br /> <br />both permanent and <br />This will include <br />sideslopes, and bank <br /> <br />. Presentation of a plan for monitoring the potential for high water in <br />future years based upon available information, This will include a <br />procedure for collecting data and the necessary materials for estimating <br />fl ood I eve Is. <br /> <br />. A table providing a summary of information on upstream clams that will <br />address flood ill\Jacts and travel times at Grill1c1 Junction. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.