My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01454
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:09:18 PM
Creation date
10/4/2006 10:02:51 PM
Metadata
Fields
Template:
Floodplain Documents
County
Mesa
Community
Grand Junction
Stream Name
Colorado River
Title
Colorado River Flood Analysis - A Proposal for Engineering Services
Date
11/1/1983
Prepared For
Grand Junction
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />in Jefferson County. The earthen dam was 30 feet high and 1,200 feet long. <br />Work included all hydrology, flood routing, and analysis of alternative <br />spillway designs. <br /> <br />. Van Bibber Water Storage Reservoir, Feasibi 1 ity Invest"igation (1980) - <br />Planning, preliminary design and cost estimates investigating expansion of <br />the proposed Van Bibber Detention Dam for water supp ly. <br /> <br />. Jensen Dam, Permanent Pool Storage FaciJ ity (1982) - Hydrologic ana'lysis <br />including flood storage routing for impoundment capacity. Final design of <br />embankment, spillway, outlet stuctures and final cost estimates and <br />construction specifications for planned industrial development in Jefferson <br />County. <br /> <br />. Brunner Reservoir Feasibility Study (1978) - Preliminary design of <br />reservoir alternatives for water supply, flood storage and a recreational <br />facility in Broomfield, Colorado. <br /> <br />. Hays Lake Outfall System (1981) - Completed a hydrologic investigation and <br />preliminary design for a spillway rehabilitation and storm sewer outfall <br />for a dam in the City of Arvada. <br /> <br />. North Prong Diversion Channel (1980) - Hydrologic and hydraulic analyses, <br />preliminary and final design of 1.5 miles of a grass-lined diversion <br />channel including two large culvert drop structures. <br /> <br />Experience of Greenhorne & O'Mara, Inc. <br /> <br />. Hydrologic Reviews, Nationwide Flood Insurance Studies (1977-,1983) - <br />Greenhorne & O'Mara, In~ serves as a Technical Evaluation Contractor for <br />the Federal Emergency Management Agency. During the last six years, our <br />staff has reviewed more than 1,000 flood insul-ance studies and has prepared <br />more than 15,000 Flood Insurance a,nd Flood Boundary Maps. <br /> <br />. Hydraulic Investigations of Nine Dams (1978) ", Completed hydraulic <br />investigations for nine water storage impoundments. Included were spillway <br />capacity evaluations, impoundment capa,city determinat"ions and establishment <br />of optimum reservoir operation procedures. <br /> <br />. Hydrologic Assessment in Coal Mining Areas (1977) - Assessment of <br />hydrologic conditions pertaining to coal mining areas and assessment of the <br />impacts of surface mining on the ground and surface water. <br /> <br />. Gui lford Road Storm Water Management Project, Pr'ince George's County, <br /> <br />1 r, <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.