Laserfiche WebLink
<br />channel improvements. Many recreational features are also included. <br />Engineer's estimate for construction was $2.1 million with eight contractor <br />bids rangi ng from $1.6 to $2.4 mi 11 i on. Current ly under construction. <br /> <br />. Foothills/Fox Meadows Channel Improvements (1983) - Final design for 2 <br />miles of major drainageway in the City of Fort Collins. The work included <br />the design of a major control structure to divert drainage out of the <br />channel of a local ditch company. <br /> <br />. Shepardson Drainage Channel Impi"ovements (1983) - Final design of 3,000 <br />feet of drainageway in the City of Fort Collins. Nine alternatives were <br />developed as possible solutions to control erosion and flows within a very <br />restricted right-of-way. The existin<) channel was er'oding and encroaching <br />on the property of existing homeowners. <br /> <br />. Centennial Park West (1982) - Planning and final design of 0.8 miles of <br />grass-lined channel and a double 4'x8' concrete box culvert across Federal <br />Boulevard with inlet and outlet concrete transitions. Used for conveyance <br />of off-site drainage through a multiple use development. <br /> <br />. Weaver Creek and SJCD North (1981) - Fin,;l design and cost estima,te for <br />approximately 1,000 feet of channel improvements on two creeks in Jefferson <br />County, Colorado. Improvements included a concrete low flow channel, drop <br />structures, a check dam, and var ious channe 1 ma i ntenance app 1 i cat ions. <br /> <br />. Boulder Creek Flood Improvement Program (1980) - Conceptual and preliminary <br />design of I.S miles of channel improvements including concrete-lined and <br />riprap-lined channels, bridge improvements, sedimentation analysis, a <br />diversion structure, and a diversion channel in Boulder Creek through the <br />City of Boulder, Colorado. <br /> <br />. Big Sandy Dam and Reservoir (1982-1983) .. Final design for a SO-foot high, <br />1,600-foot long earthen dam and associated 21,000 acre-foot reservoir. <br />Work included hydrology, embankment design and design for spillway and <br />outlet works. The project was undertaken for the Wyoming Water Development <br />Commission but is currently on hold. <br /> <br />. Big Sandy Salinity Investigations (1981) - Appraisa-I leve'l design for nine <br />salinity control options. Conceptual designs were completed for several <br />reservoirs, numerous wells and ISO m'iles of pipeline with associated pump <br />stations. The project was completed for the U.S. Bureau of Reclamat'ion. <br /> <br />. Van Bibber Detention Dam, Feasibility Investigation (1980) - Preliminary <br />design of an earthen dam and spillway for flood control on Van Bibber Creek <br /> <br />1l. <br />