My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01390
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01390
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:40:01 AM
Creation date
10/4/2006 9:59:18 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
Standard Operating Procedures Manual for Interagency Hazard Mitigation Teams
Date
3/1/1984
Prepared For
US
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment #30 <br /> <br />. <br /> <br />May 10, 1983 <br /> <br />MEMORANDUM TO: Region VIII Hazard Mitigation Team Members <br /> <br />FROM: Federal Hazard Mitigation Team Leader <br />SUBJECT: Recommendations for the 15 Day Report <br /> <br />Enclosed are the recommendations that the Team has developed for <br />the 15 Day Hazard Mitigation Report. Please review these <br />recommendations and call Bill Callahan or Clancy Philipsborn with <br />your comments by close of business on Wednesday, May 10, 1983. <br />PHONE (801) 374-0800 or FTS: 584-1260. <br /> <br />. <br /> <br />. <br /> <br />Also enclosed are maps, graphs, newspaper clippings, etc., that <br />pertain to the Report. Please give us your ideas for how you <br />would like to see the Report presented. <br /> <br />I would like to assemble all the data that each Team member has <br />gathered since May 4, 1983. This includes but is not limited to: <br /> <br />(a) A National Weather Service summary to use as an <br />appendix <br /> <br />(b) Copies of the Toutle-Cowlitz Plan <br /> <br />(c) Photographs and slides taken during the Team <br />reconaissance <br /> <br />(d) S.B.A. Economic Injury Report <br /> <br />(e) Pertinent data relating to the newly proposed highway <br /> <br />(f) New Army Corps of Engineers proposals or data <br /> <br />(g) A trip report on your observations and recommendations <br />concerning the overview of the Utah Lake - Jordan River <br />- Great Salt Lake complex. <br /> <br />(h) The critique that was placed in your first-meeting <br />folder <br /> <br />(i) Ideas for maps, graphs, and graphics. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.