Laserfiche WebLink
<br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. Where appropriate, undersized crossing structures along Godding Hollow and Tri- <br />Town should be improved and enlarged to meet existing drainage criteria. These <br />improvements will reduce backwater elevations and roadway overtopping. <br /> <br />· Open channels should be improved and enlarged to reduce channel overbank <br />flooding and mitigate potential channel erosion. <br /> <br />· Regional detention ponds should be constructed within each basin to limit the peak ' <br />discharges within each drainageway. ' <br /> <br />· On-site detention ponds should be constructed within the basin to limit the peak <br />discharges in the 'Godding Hollow and north of WCR 18 in Tri- Town Basin, as <br />well as the runoff from each subbasin, to the magnitude of the existing condition, <br />10-year and 100-year flood events. On-site detention ponds should be constructed <br />south ofWCR 18 in Tri-Town Basin to limit the peak discharges to the magnitude <br />of the existing condition, 2-year flood event. <br /> <br />. Maintain or replace the existing roadway and railroad embankment detention <br />ponds. The releases from these structures should be limited so as to maximize the <br />existing storage present at these locations. <br /> <br />· Construct spill structures, where appropriate, along the irrigation canalsiditches to <br />prevent flooding and redirect flows to the major outfall conveyance facilities or <br />major drainageways. <br /> <br />5.2 Description of Drainage Improvements <br /> <br />The improvements discussed in the previous section were initially evaluated and screened <br />for applicability'. A preferred list of improvements was identified and a comprehensive plan was <br />developed that would address flooding problems along the major drainageway within the Godding <br />Hollow and Tri-Towh Basins. In the paragraphs that follow, the preferred improvements are <br />discussed. Unless otherwise stated, these improvements assume that on-site detention is provided <br />to limit the releases for future developments in the Godding Hollow Basin and north of WCR 18 <br />in the Tn-Town Basin to the 10-year and 100-year existing condition levels, and south ofWCR 18 <br />in the Tri-Town Basin to the 2-year existing condition level. <br />The drainage improvement plans for each reach are referenced in Figure 5.1. Figures 5.2 <br />to 5.11 present the plans associated with the improvements to the Godding Hollow Basin. <br />Improvements associated with the Tri- Town Basin are presented in Figures 5.12 to 5.17. <br /> <br />T:l0PENlCoweidOllc.oweidOI fn] rpt. wpd <br /> <br />5.3 <br /> <br />September 8, 1999 <br />