My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01374
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:18 PM
Creation date
10/4/2006 9:58:29 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
521
County
Weld
Community
Erie, Firestone, Dacono
Stream Name
Tri-town drainageway, Godding Hollow Basin
Title
South Weld I-25 Corridor Master Drainage Plan
Date
9/8/1999
Prepared For
Weld County
Prepared By
Anderson Consulting Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />V. DRAINAGE IMPROVEMENTS <br /> <br />5.1 Formulation of Drainage Improvements <br /> <br />As part of the master planning efforts, feasible drainage improvements were considered <br />to reduce the flooding problems associated \>lith existing or future development conditions within <br />the Godding Hollow and Tri- Town Basins. To facilitate the screening and evaluation of proposed <br />improvements as well as the formulation of an implementation plan, the major drainageways were <br />divided into reaches. These reaches are described as follows: <br /> <br />Godding Hollow Basin Reach G1: Saint Vtain River to "The Shores" Lakes Outlet <br />Godding Hollow Basin Reach G2: Outlet of "The Shores" Lakes to WCR 24 <br />Godding Hollow Basin Reach G3: WCR 24 to Godding Ditch <br />Godding Hollow Basin Reach G4: WCR 20 <br />Godding Hollow Basin Reach G5: WCR 18 <br />Godding Hollow Basin Reach G6: WCR 16 <br />Godding Hollow Basin Reach G7: State Highway 52/Coalridge Ditch <br />Godding Hollow Basin Reach G8: WCR 12 <br />Godding Hollow Basin Reach G9: I-25/WCR 10 <br />Godding Hollow Basin Reach G10: West Tributary at I-25 <br /> <br />Tri-Town Basin Reach T1: WCR 24 <br />Tri-Town Basin Reach T2: WCR 22 <br />Tri-Town Basin Reach 13: WCR 20fWCR 18 <br />Tri- Town Basin Reach'T4: Firestone/Frederick <br />Tri-Town Basin Reach T5: FrederickfDacono <br />Tri-Town Basin Reach T6: Railroad Embankment Detention Ponds <br /> <br />In general, several improvements were initially identified as potential solutions for the <br />drainage problems discussed in Chapter 4. These improvements were also intended to meet <br />master planning objectives associated with the undeveloped portions of both basins. The following <br />items were considered during the formulation of a comprehensive drainage plan for the Godding <br />Hollow and Tri-Town Basins. <br /> <br />T:10PEMCoweldOllcoweldOJ fnl rpf.wpd <br /> <br />5.1 <br /> <br />September 8. 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.