Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />16.04 Bids shall be deposited in the designated location prior to the time and date <br />for receipt of Bids indicated in the Invitation to Bid, or the modified time and <br />date indicated by addendum. Bids received after the time and date for receipt <br />of Bids will be returned unopened. Bidder shall assume full responsibility <br />for timely delivery at the location designated for receipt of Bids. <br /> <br />16.05 Oral, telephone or telegraph Bids are invalid and will not receive <br />consideration. No Bidder may submit more than one Bid. Multiple Bids under <br />different names will not be accepted from one firm or association. <br /> <br />PART 17 POST BID/PREAWARD SUBMITTALS <br /> <br />17.01 To be considered further in evaluation, the three low bidders must submit <br />the following information on the date following the Bid opening by 10:00 <br />a.m.: <br /> <br />A. List of a minimum of five recent similar projects the Contractor has <br />performed. <br /> <br />B. Copy of the most ...ecent financial statement of the General Contractor. <br /> <br />C. Copies of the most recent financial statements of the major <br />subcontractors included in the Bid submittal. <br /> <br />D. Ust of Project Managers and Superintendents to be used on this project <br />for the General Contractor and all major Subcontractors. <br /> <br />E. Names and telephone numbers of a minimum of five references on similar <br />work for the General Contractor and all major Subcontractors. <br /> <br />17.02 Hand deliver the above information to Architect. <br /> <br />17.03 The above information must be available at the time and place indicated to be <br />considered in further evaluation, and therefore, all Bidders are <br />recommended to compile this data prior to the Bid letting to avoid defaulting. <br /> <br />IB-9 <br />