My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01287
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:19 PM
Creation date
10/4/2006 9:54:44 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Littleton
Title
10,000 Trees - Phase Three South Platte Park, Littleton, Colorado
Date
10/4/1991
Prepared For
Littleton
Prepared By
DHM, Inc.
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />16.04 Bids shall be deposited in the designated location prior to the time and date <br />for receipt of Bids indicated in the Invitation to Bid, or the modified time and <br />date indicated by addendum. Bids received after the time and date for receipt <br />of Bids will be returned unopened. Bidder shall assume full responsibility <br />for timely delivery at the location designated for receipt of Bids. <br /> <br />16.05 Oral, telephone or telegraph Bids are invalid and will not receive <br />consideration. No Bidder may submit more than one Bid. Multiple Bids under <br />different names will not be accepted from one firm or association. <br /> <br />PART 17 POST BID/PREAWARD SUBMITTALS <br /> <br />17.01 To be considered further in evaluation, the three low bidders must submit <br />the following information on the date following the Bid opening by 10:00 <br />a.m.: <br /> <br />A. List of a minimum of five recent similar projects the Contractor has <br />performed. <br /> <br />B. Copy of the most ...ecent financial statement of the General Contractor. <br /> <br />C. Copies of the most recent financial statements of the major <br />subcontractors included in the Bid submittal. <br /> <br />D. Ust of Project Managers and Superintendents to be used on this project <br />for the General Contractor and all major Subcontractors. <br /> <br />E. Names and telephone numbers of a minimum of five references on similar <br />work for the General Contractor and all major Subcontractors. <br /> <br />17.02 Hand deliver the above information to Architect. <br /> <br />17.03 The above information must be available at the time and place indicated to be <br />considered in further evaluation, and therefore, all Bidders are <br />recommended to compile this data prior to the Bid letting to avoid defaulting. <br /> <br />IB-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.