My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01287
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:19 PM
Creation date
10/4/2006 9:54:44 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Community
Littleton
Title
10,000 Trees - Phase Three South Platte Park, Littleton, Colorado
Date
10/4/1991
Prepared For
Littleton
Prepared By
DHM, Inc.
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />13.10 The address to which communications regarding the Bid are to be directed <br />must be shown. <br /> <br />PART 14. SlJBCCJII'TRACTORUSTlNG <br /> <br />14.01 Each Bidder shall list on the form provided, the name and the address of each <br />subcontractor who will perform work or labor, or render service to the <br />Bidder in or about the work, or a licensed subcontractor who, under <br />subcontract to the Bidder, specially fabricates and installs a portion of the <br />work, in an amount in excess of $1,000.00. and the portion of the work <br />which will be performed by the subcontractor. <br /> <br />PART 15. EQUIPMENT SUPPUER USTING <br /> <br />15.01 Each Bidder shall list on the form provided the name of the manufacturers or <br />suppliers of the items of equipment and systems which he proposed to <br />furnish. Upon the award of the contract, the named equipment shall be <br />furnished. Substitutions will be permitted only if named equipment does not <br />meet the specifications or the manufacturer is unable to meet delivery <br />requirements of the construction schedule. <br /> <br />15.02 Preliminary acceptance of equipment listed by manufacturer's name shall <br />not in any way constitute a waiver of the specifications covering such <br />equipment; final acceptance will be based on full conformity with the <br />specifications covering the equipment. <br /> <br />15.03 Failure to furnish all information requested may be cause for rejection of <br />the Bids. <br /> <br />PART 16. SUBMISSIONQEaws <br /> <br />16.01 Bids shall be submitted at the time and place indicated in the Invitation to Bid <br />and shall be included in an opaque, sealed envelope addressed to Owner and <br />identified on the outside with the Bidder's name and address and with the <br />words :aki1w: 10.000 Trees - Phase Three. South Platte Park". <br /> <br />16.02 Each Bid shall be accompanied by the Bid Security and other required <br />documents. <br /> <br />16.03 If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate <br />mailing envelope with the notation "BID ENCLOSED" on the face thereof. <br /> <br />IB.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.