My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01211
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:55 PM
Creation date
10/4/2006 9:51:31 PM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Stream Name
Fountain Creek
Title
Pueblo Flood Control Project
Date
1/1/1990
Prepared For
Pueblo County
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />PRASE II GENERAL DESIGN MEMORANDUM <br />ARKANSAS RIVER AND TRIBUTARIES ABOVE JOHN MARTIN DAM <br />FOUNTAIN CREEK, PUEBLO, COLORADO <br /> <br />PERTINENT DATA. <br /> <br />Project Purpose <br /> <br />. <br /> <br />Velocity <br />Slope Protection <br /> <br />Flood Protection and <br />Recreational Facilities <br />8,800 feet of East <br />bank levee <br />900 feet of West <br />bank levee <br />11,500 feet of <br />channel improvement <br />200-year recurrence <br />85,000 cfs <br />Undisturbed low flow <br />Limited to 3 feet above <br />thalweg <br />0.004 <br />Varies from 13 to 20 feet <br />Maximum 20 feet <br />Varies from 8 to 20 fps <br />12" to 42" riprap and <br />soil cement on channel <br />improvement slopes <br />3-4 feet <br />$7,792,000 <br />$4,970,000 <br />$2,822,000 <br />1.15 <br />8 feet <br />Soil cement, Earth fill <br /> <br />Physical Features <br /> <br />Level of Protection <br />Design Discharge <br />Channel Width <br />Channel Excavation <br /> <br />Channel Invert Slope <br />Depth of Flow <br /> <br />Freeboard <br />Total Project Cost <br />Federal First Cost <br />Local Cost including recreation <br />Benefit-Cost Ratio <br />Average Height of Levee <br />Levee Materials <br /> <br />. <br />) <br /> <br />vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.