Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />the corrected effective and post-project condition models are indicated. The 100-year water <br />surface elevations are generally lower in the post-project condition analysis (from 0,1 to 0.4 feet) <br />upstream of the BNRR to Centre Avenue. as compared to the corrected effective analysis. <br />Directly upstream of Centre A venue, the post-project condition analysis matches the corrected <br />effective profile, Graphical representation of the post-project condition flood profiles through the <br />current study reach is provided in Appendix B, In addition, cross sections through the study reach <br />which were modified for the post-project condition analysis are graphically displayed in Appendix <br />C. <br /> <br />Table 4.4 <br /> <br />Comparison of 100-Year Water Surface Profiles for Corrected Effective and Post- <br />Project Condition Analyses, <br /> <br /> 100- Year <br /> HEC-2 Water Surface Elevation Difference <br />FIRM Cross (ft, NGVD) in WSEL Location <br />Panel ID <br /> Section Corrected Post-Project (feet) <br /> Effective Condition <br /> 16430 4993,5 4993.4 -0,1 upstream side of BNRR <br /> embankment <br />BF 17380 4993,5 4993.4 -0,1 <br /> 18075 4993.5 4993.4 -0,1 <br />BG 18135 4993,5 4993.4 -0,1 downstream face of unnamed road <br />(Bay Road) <br /> 18168 4993,5 4993.4 -0,1 upstream face of unnamed road <br /> (Bay Road) <br /> 18240 4993.5 4993.4 -0,1 <br />BH 18625 4993,5 4993.4' -0,1 <br /> 18770 4993,7b 4993,3 -0.4 <br />BI 19337 4994,7 4994,7 0,0 <br /> 19830 4997.4 4997.4 0,0 downstream side of Arthur Ditch <br />BJ 19880 4997,7 4997,7 0,0 upstream side of Arthur Ditch <br />BK 20315 4999,3 4999,3 0,0 <br /> <br />, Based on interpolated post -project condition WSEL. <br />b Based on interpolated corrected effective WSEL. <br /> <br />For the post-project condition floodway analysis, floodway encroachments were modified <br />from those defined in the corrected effective model to reflect narrowing of the floodplain due to <br />the lower WSEL's associated with the post-project analysis, Results of the post-project condition <br />floodway analysis are summarized in Table 4,5, The table indicates that the floodway water <br />surface elevations are identical to the base flood elevations, thereby meeting the intent of the <br /> <br />f"OPEN":l)\:srfOl'cocsrtDl fema-LOt\'lR linal-rpl.\vpd <br /> <br />21 <br /> <br />ANdERSON CONsulTiNG ENGiNEERS, INC, <br />