My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00850
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:24 PM
Creation date
10/4/2006 9:32:06 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
31
County
Arapahoe
Community
Unincorporated Arapahoe County
Title
Major Drainageway Planning - Little Dry Creek, Report, Volume I
Date
2/1/1974
Designation Date
6/1/1974
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Item <br />No. <br />(1) <br /> <br />Table 10 <br />ESTIMATED COST OF LITTLE DRY CREEK DRAINAGEWAY IMPROVEMENTS <br /> <br />Descri)tion <br />(2 <br /> <br />Channelization <br /> <br />condui ts <br /> <br />1.. <br /> <br />Greenwood Gulch above its confluence with Little Dry <br />Creek, in Cherry Hi 11 s Vi 11 age <br /> <br />Little Dry Creek near its confluence with Greenwood <br />Gulch, in Cherry Hills Village <br /> <br />2. <br /> <br />3. <br /> <br />Little Dry Creek from Sherman Street to Clarkson Street <br />in Englewood <br /> <br />Little Dry Creek from South Platte River to outlet of <br />Cinderella Conduit in Englewood <br /> <br />Subtotal Channelization <br /> <br />4. <br /> <br />6. <br /> <br />Cinderella Conduit extension from present entrance <br />to Sherman Street <br /> <br />Dams <br /> <br />8. <br />9. <br />10. <br />11. <br /> <br />12. <br /> <br />7. <br /> <br />Cinderella Conduit entrance improvements to increase <br />capacity <br /> <br />Subtotal conduits <br /> <br />Estimated <br />1973 Cost <br />Dollars** <br />(3) <br /> <br />227,000 <br /> <br />393,000 <br /> <br />792,000 <br /> <br />564,000 <br />1,976,000 <br /> <br />1 ,235,000 <br /> <br />176,000 <br />1,411 ,000 <br /> <br />1 ,000,000 <br />755,000* <br />972,000* <br /> <br />571 ,000* <br /> <br />479,000* <br />3,777,000 <br />7,164,000 <br /> <br />*Inc1udes cost of right-of-way for all 4 dams at $414,000. <br />**The estimated cost for each item includes allowances of 20% for <br />construction contingency and 15% for engineering and administration. <br /> <br />Englewood Dam improvements <br />Holly Dam <br /> <br />Berry Dam and Prentice Dam <br /> <br />Blackmer Dam improvements <br /> <br />Quincy Dam <br />Subtotal Dams <br />TOTAL COST OF IMPROVEMENTS <br /> <br />-63- <br />
The URL can be used to link to this page
Your browser does not support the video tag.