Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />There are complex engineering and legal problems <br /> <br /> <br />Canal which are beyond the scope of this report. <br /> <br /> <br />Studied separately. <br /> <br />associated with Highline <br />These problems are being <br /> <br />Utilities <br /> <br />Water, sewer, gas, electric power, and telephone lines have not been <br /> <br /> <br />specifically located for preliminary design purposes. Estimated con- <br /> <br /> <br />struction costs include an allowance for utility relocation, but spe- <br /> <br /> <br />cific utility interference problems should be resolved in final design. <br /> <br />-54- <br />