Laserfiche WebLink
<br /> <br />comply with applicable standards, per- <br />mit conditions, and regulations of appro- <br />priate agencies. <br />2. Permanent erosion and sediment control <br />measures shall be installed at the earliest <br />practicable time. One of the first con- <br />struction activities shall be the place- <br />ment of permanent and temporary ero- <br />sion and sediment control measures <br />around the perimeter of the project or the <br />initial work areas. <br />3. Temporary erosion and sediment control <br />measures shall be coordinated with per- <br />manent measures to assure economical, <br />effective, and continuous control through- <br />out the construction phase. <br />4. Erosion and sediment control measures <br />shall be continuously maintained to per- <br />form their intended function during con- <br />struction of the project. <br />5. Construction operations in rivers, <br />streams, lakes, or other bodies of water <br />shall be restricted to: <br />A. Channel change areas designated in <br />the Contract. <br />B. Areas designated in the Contract <br />which must be entered to construct <br />structures or erosion and sediment <br />control measures; and <br />C. Areas where waters must be forded <br />no more than four times per day to <br />facilitate construction. Fording <br />waters more than four times per day <br />will not be permitted; temporary <br />bridges or other structures shall be <br />constructed where more than four <br />crossings per day are required. <br />6. Pollutant byproducts of highway con- <br />struction, solids, sludges, pollutants re- <br />moved in the course of treatment of <br />wastewater, and material from sediment <br />traps shall be handled, stockpiled, or <br />disposed of in such a manner so entry <br />into any watercourse or impoundment is <br />prevented. <br />7. The use of chemicals such as soil stabiliz- <br />ers, dust palliatives, sterilants, growth <br />inhibitors, fertilizers, deicing salts, etc., <br />during highway construction shall be in <br />accordance with the manufacturer's <br />recommended application rates, freq- <br />uency, and instructions. These chemicals <br />shall not be used within 50 feet of the <br />ordinary high water line of any water- <br />course or impoundment. <br />8. When a project is subject to a water <br />quality permit, the quantities of dis- <br />charges, locations of discharges, comp- <br />osition of discharges, and quantities of <br />dredging and fills will be stated in the <br /> <br />27 <br /> <br />permit. If the Contractor anticipates a <br />change from permit conditions, or if con- <br />struction activities result in noncom- <br />pliance with permit conditions, the Con- <br />tractor shall detail the anticipated <br />changes or noncompliance in a written <br />report to the Engineer. The submission of <br />the report shall be within five days from <br />the time the Contractor becomes aware of <br />change or noncompliance. Within 10 <br />days after receipt of the report, the <br />Engineer will approve or disapprove the <br />request for change, or detail the course of <br />action after noncompliance. <br />9. Any diversion from, or bypass of, facil. <br />ities necessary to maintain compliance <br />with the terms and conditions contained <br />in the Contract is prohibited except, (1) <br />where unavoidable to prevent loss of life <br />or severe property damage, or (2) where <br />excessive storm drainage or runoff would <br />damage the facilities. If diversion or <br />bypass of the facilities occurs, the Con- <br />tractor shall notify the Engineer in <br />writing within five days of the occur- <br />rence. The Engineer will assess the <br />damage, if any, resulting from the occur- <br />rence, and detail a course of action. <br />10. Fuels, lubricants, and other petroleum <br />distallants shall be stored in accordance <br />with the provisions of subsection 106.05. <br />Equipment servicing shall occur within <br />the designated area. <br />11. Areas designated in the Contract shall <br />be seeded or revegetated at the earliest <br />practicable time to prevent soil erosion. <br />12. Fill material shall be comprised of <br />material which conforms to the require- <br />ments of Section 203 and shall be placed <br />as provided in the Contract. <br />13. The Contractor shall not place plastic <br />concrete into wetlands, watercourses, or <br />impoundments. <br />14. The work shall be planned and exscuted <br />to require a minimum amount of main- <br />tenance during construction. Whenever <br />possible, work shall be done from the <br />bank. <br />15. Not less than 15 days prior to com- <br />mencing dredging or fill operations in a <br />watercourse, the Contractor shall <br />provide written notification to owners or <br />operators of domestic or public water <br />supply intakes or diversion facilities, if <br />these facilities are within five miles <br />downstream from the dredging or fill <br />operations. <br />16. The construction activities shall not <br />impair Indian tribal rights, including, <br />but not limited to, water rights, and <br />