Laserfiche WebLink
<br /> <br />COLORADO DIVISION OF HIGHWAYS <br />SUPPLEMENTAL SPECIFICATIONS <br />TABLE OF CONTENTS <br /> <br />Section 100 General Provi.lons....... ................ 1 <br /> <br />Section 101 Definition. and Term. ........... ........ 1 <br /> <br />Seetlon 102 Bidding Requirements and <br />Conditions.. ............................. II <br />102.01 Prequallfication of Bidders .................... <br />102.02 Contents of Propo.al Forms................... <br />102.03 Issuance of Proposal Forms. . . . . . . . . . . . . . . .. 6 <br />102.04 Interpretation of Quantitie.In <br /> <br />Propo.al Form............................... <br />102.05 Interpretation of Plans, and Specification. .... <br />102.06 Ex.amination of Plans, Specifications, <br />Special Provisions and Site of Work. .... .. . . . <br />102.07 Preparation of Propo.al.. ...... ............. 7 <br />102.08 Irregu!arProposals...... ........... .......... <br />102.09 Proposal Guaranty ........................... <br />102.10 Delivery of Proposals .... ..................... <br />102.11 Withdrawal or RevIsion of Proposals. . . . . .. .. . <br />102.12 Combination or Conditional Propo.als ........ <br />102.13 Public Opening of Proposals .................. <br />102.14 DIsqualification of Bidders. . . . . . .. . . . . . . . . . . .. <br />102.15 Anti.CollusionMfidavlt. ................... 8 <br />102.16 Material Guaranty....................... ..... <br /> <br />Section 103 <br />103.01 <br />103.02 <br />103.03 <br />103.04 <br />103.05 <br />103.06 <br />103.07 <br /> <br />A ward and Exeeution of Contract ..... . . . . <br />Consideration of Proposal.. ................... <br />Award of Contract. ...... ..................... <br />Cancellation of Award ....... .............. ... <br />Return of Propoeal Guaranty.... .............. <br />Requirement of Contract Bonds ............... <br />Execution and Approval of Contract .......... <br />Failure to Execute Contract ........ ........... <br /> <br />Section 104 <br />100.or <br />104.02 <br /> <br />Scope of Work ............................ 9 <br />Intent of Contract ....................... ..... <br />Differing Site Conditions, .Suspensions of <br />Work and Significant Changes in the <br />Character of Work ........................... <br />Extra Work........ ................ ........ 10 <br />MalntainlngTraffic ..................... ..... <br />Rights In and Use of Materials <br />Found on the Work ....................... 11 <br />FInal Cleaning Up............................ <br /> <br />104.03 <br />104.04 <br />104.05 <br /> <br />104.06 <br /> <br />Section 1011 Control of Work ............................ <br />105.or Authority of the Engineer ..................... <br />105.02 Plans and Shop Drawings .................... <br />105.03 Conformity with Plans and <br />Specifications............................ 12 <br />105.04 Coordination of Plans, Specification., <br />Supplemental Specifications and <br />Special ProvisioDS .............. .......... 13 <br />105.05 Cooperation by Contractor................. 14 <br />105.06 Cooperation with Utilities..................... <br />105.07 Cooperation Between Contractors. . . . . . . ... .. . <br />105.08 Construction Stakes, Uneo and Grades........ <br />105.09 Authority and Duties of the <br />Project Engineer. ...... ................... 15 <br />105.10 Duties of the Inspector........................ <br />105.11 Inspection and Testing of Work ............... <br />105.12 Removal of Unacceptable Work and <br />Unauthorized Work....................... 16 <br />105.13 Load Restrictions.. ........................... <br />105.14 Maintenance During Construction ............ <br />105.15 Failure to Maintain Roadway or Structure... <br />105.16 Acceptance.......... ......................... <br />105.17 Claims for Contract Adjustments .......... 17 <br /> <br />Section 108 <br />106.01 <br /> <br />Control of Material... ................... 20 <br />Source of Supply and <br />Quality Requirements.. ...................... <br />Material Sources.............................. <br />Sampleo, Teots, Cited Specifications. . . . . . .. 21 <br />Material Inspection at Plant .................. <br />Storage of Materials .......................... <br />Handling Materials.. .................... ..... <br />Division Furnished Materials .. . . . . . . . . . . . . . . . <br />Steel Producte ............................. 22 <br /> <br />106.02 <br />106.03 <br />106.04 <br />106.05 <br />106.06 <br />106.07 <br />106.08 <br /> <br />Section 107 Legal Relation. and Re.pon.lbility <br />toPubllc .... ............................... <br />107.01 Laws to be Observed ...... ..... .... ........... <br />107.02 Permits, Licenses and T""eo . . . . . . . . . . . . . . . .. . <br />107.03 Patented Devices, Material., <br />and Processes ............................... <br />107.04 Restoration of Surfaces Opened by Permit. . ... <br />107.05 Federal Aid Provisions........................ <br />107.06 Sanitary, Health and Safety Provisions....... <br />107.07 Public Convenience and Safety. . .. . . . . . .. .. 23 <br />107.08 RaIlway.Highway Provision. ................. <br />107.09 Construction Over and Adjacent to <br />Navigable Waters........................... <br />107.10 Barricadeo and Signs......................... <br />107.11 UseofExplosiveo.. ...................... ..... <br />107.12 Protection and Restoration of <br />Property and Landecape ..................... <br />107.13 ForestProtectlon ...... .... ................... <br />107.14 Interruption of Irrigation Water Flow...... 24 <br />107.15 Responsibility for Damage Claim. ............ <br />107.16 Opening Sections of Project to Traffic.... . . . . . <br />107.17 Contractor's Responsibility for Work. .. . . .. 25 <br />107.18 Contractor's Responsibility for <br />Utility Property and Serviceo ................ <br />107.19 Furnlohlng Right of Way ..................... <br />107.20 Personal Liability of Public Employ........... <br />107.21 No Waiver of Legal Rights ... ................. <br />107.22 Third Party Beneficiary. ...................... <br />107.23 Archaeological and Paleontological <br />Discoveries............................... 26 <br />107.24 A1rQualityControl........................... <br />107.25 Water Quality Control..................... 26 <br /> <br />Section 108 <br />108.or <br />108.02 <br />108.03 <br />108.04 <br />108.05 <br /> <br />Pro.ecutlon and Progre... . . . . . . . . . . . . .. 28 <br />Subletting of Contract ............... ......... <br /> <br />Notice to Proceed ............................. <br />Progress Schedule ............................ <br />Llmltstion of Operations. .................. 29 <br />Character of Workers; Methods <br />and Equipment.............................. <br />Determination and Extension of <br />Contract Time ............................ 30 <br />Failure to Complete Work on Time ............ <br />Default of Contract ........................ 31 <br />Termination of Contract ...................... <br /> <br />108.06 <br /> <br />108.07 <br />108.08 <br />108.09 <br /> <br />Section 109 Measurement and Payment. . . . . .. . . . . . . . . . <br />109.01 Meaeurement of Quantitie. ................ 32 <br />109.02 Scope of Payment.. ................... ..... 34 <br />109.03 Compensation for Altered Quantities. . . . . . . . . . <br />109.04 Extra and Force Account Work. . . . . . . . . . . .. 34 <br />109.05 Eliminated Items ............. ............. 36 <br />109.06 Partial Payments............................. <br />109.07 Payment for Material on Hand <br />(Stockpiled Material).:....................... <br />109.08 Adjustments for Changes in <br />Common Carrier Rates ....... ............ 37 <br />109.09 Acceptance and Final Payment. . . . . . . . ..... . . <br />