My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00844
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:51:19 AM
Creation date
10/4/2006 9:31:54 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
Supplemental Specifications to the 1986 Standard Specifications for Road and Bridge Construction
Date
9/1/1989
Prepared For
State of Colorado
Prepared By
State of Colorado Department of Highways
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />no contract unit prices exist. The Engineer <br />will determine the work to be classed as <br />special maintenance. <br /> <br />104.05 Rights in and Use of Materials <br />Found on the Work. The Engineer may authorize <br />the Contractor's use of materials found in the <br />excavation for completing pay items other than <br />excavation. Payment will be made for both the <br />excavation of such materials at the corresponding <br />contract unit price, and for the pay item for which the <br />excavated material is used. The Contractor shall <br />replace the removed material with acceptable <br />material at no additional cost to the Division. The <br />Division will not charge the Contractor royalty or <br />additional cost of select material for the removed <br />material. The Contractor shall not excavate or <br />remove any material from within the roadway <br />which is not within the grading limits, as indicated <br />by the slope and grade lines, without written <br />authorization from the Engineer. <br />Unless otherwise provided, the material from <br />structures designated for removal and not to be <br />salvaged may be used temporarily by the Contractor <br />in the erection of the new structure. <br /> <br />104.06 Final Cleaning Up. Before final <br />acceptance, the highway, material pits, and all <br />ground occupied by the Contractor in connection <br />with the project shall be cleaned of all rubbish, <br />excess materials, temporary structures, and equip- <br />ment; and all parts of the work shall be left in an <br />acceptable condition. The cost of final cleanup will <br />not be paid for separately but shall be included in the <br />work. <br /> <br />SECTION 105 <br />CONTROL OF WORK <br /> <br />\ <br /> <br />105.01 Authority of the Engineer. The <br />Engineer will decide all questions regarding the <br />'Quality and acceptability of materials furnished, <br />, <br />work performed, and the rate of progress of the work; <br />all interpretation of the plans and specifications; <br />and the acceptable fulfillment of the Contract. <br />The Engineer will, in writing, suspend the work, <br />wholly orin part when the Contractor fails to correct <br />conditions unsafe for the workmen or the general <br />public; for failure to carry out Contract provisions; <br />for failure to carry out orders; for periods of un- <br />suitable weather: for conditions unsuitable for the <br />prosecution of the work, or for any other condition or <br />reason determined to be in the public interest. <br /> <br /> <br />105.02 Plans and Shop Drawings. The <br />Division's plans will show details of all structures, <br />lines, grades, typical cross sections of the roadway, <br />location and design of all structures and a summary <br />of items appearing on the proposal. Only general <br /> <br />features will be shown for steel and prestressed <br />concrete bridges. <br />The plans shall be supplemented by shop draw- <br />ings as necessary to adequately control the work. <br />Shop drawings may consist of drawings, diagrams, <br />illustrations, schedules, calculations, and other data <br />prepared by the Contractor, subcontractor, manufac- <br />turer, supplier, or distributor, which will illustrate <br />how specific portions of the work shall be fabricated <br />and/or installed in accordance with the Contract. <br />Shop drawings are not part of the Contract <br />documents. <br />Six sets of shop drawings shall be submitted to the <br />Engineer. One additional set shall be submitted for <br />railroad separation structures. After checking, two <br />sets will be returned to the Contractor; one for his use <br />and the other for the fabricator or supplier's use. <br />Shop drawings returned to the Contractor will be <br />stamped to indicate the following: <br />(1) Approved, No exception taken. <br />(2) Approved. Revise as noted. <br />(3) Not approved. Resubmit. <br />If shop drawings are returned for reVISion, <br />revisions shall be made and they shall be resub- <br />mitted by the Contractor. <br />The time required for the Division's approval of <br />each submittal will not exceed four weeks after shop <br />drawings are received by the Engineer. <br />If the Contractor's controlling operations are de- <br />layed or interefered with by reason of the Division's <br />failure to return shop drawings within the specified <br />four weeks time, an extension of time commensurate <br />with the delay in completion of the work thus caused <br />will be granted as provided in subsection 108.06. <br />All shop drawings shall be 34 inches long and 22 <br />inches wide overall. There shall be a two inch margin <br />on the left side of the sheet and a one-half inch <br />margin on the other three sides. A blank space, six <br />inches by three inches, shall be left near the lower <br />right-hand corner for an approval stamp. <br />Where design notes or catalogue cuts are required, <br />they may be submitted on 8% in. x 11 in. sheets in lieu <br />of the size mentioned above. <br />There shall be a title block in the lower right-hand <br />corner of each sheet. The title block shall show the <br />project number, structure number, the location of the <br />structure, and the contents of the sheet. <br />Any work performed on the project, regarding <br />work requiring shop drawings, will not be accepted <br />until after the shop drawings have been approved <br />and the work is in conformance with the drawings <br />and the provisions of the Contract. <br />Approval of the shop drawings shall not relieve the <br />Contractor of the obligation to meet all requirements <br />of the Contract and shall not relieve the Contractor <br />of the responsibility for the correctness of the shop <br />drawings. Change to the approved shop drawings <br />requires reapproval. Upon completion of the work, <br />the Contractor shall deliver to the Engineer one set of <br />the approved corrected shop drawings. <br /> <br />11 <br />