<br />against the Contral.otorin such amount as the <br />Engineer may determine to be fair and <br />equitable. <br />If the alterations or changes in quantities <br />do not significantly change the dharacter of <br />the work to be performed under the Contract, <br />the altered work will be paid for as provided <br />elsewhere in the Contract. The term "signif- <br />icant change" shall be construed to apply <br />only to the following circumstances: <br />(1) When the character of the work as altered <br />differs materially in kind or nature from <br />that involved or included in the original <br />proposed construction, or <br />(2) When a major item of work is increased in <br />excess of 125 percent or decreased below <br />75 percent of the original contract <br />quantity. A:n.y allowance for an increase <br />in quantity shall apply only to that <br />portion in excess of 125 percent of <br />original contract item quantity, orin case <br />of a decrease below 75 percent, to the <br />actual amount of work performed. A. <br />major item is defined to be any item <br />having an original contract value in <br />excess of 10% of the original contract <br />amount. <br /> <br />104.03 Extra Work. The Contractor shall <br />perform unforeseen work, fl!r which there is no priC\l <br />included in the Contract, whenever the extra work is <br />necessary or desirable for contract completion. Thi$ <br />work shall be performed in accordance with the <br />Contract and as directed, and will be paid for as <br />provided under subsection 109.04. <br /> <br />104.04 Maintaining Traffic. Unless other- <br />wise provided, the Contractor shall keep the road <br />open to all traffic in accordance with the traffip <br />control plan during the progress of the work, and <br />shall not have contruction equipment or materials iil <br />the lanes open to traffic unless approved. The Con- <br />tractor shall schedule construction operations Si) <br />that only one side of the existing roadbed is denied to <br />traffic at any time. The Contractor shall also provide <br />and maintain in a safe condition temporary ap- <br />proaches or crossings and intersections with trails, <br />roads, streets, businesses, parking lots, residences, <br />garages and farms. The road and the intersections Qf <br />the access points and the road shall be maintained ih <br />a manner that will safely and adequately accom- <br />modate traffic. Snow removal will not be required of <br />the Contractor. <br />The Contractor shall not store materials or equip- <br />ment nor park vehicles on the highway except in <br />designated areas. <br />The Contractor shall be responsible for all expense <br />of maintaining traffic within the roadway, except <br />snow removal, and of constructing and maintaining <br />approaches, crossings, intersections, and other <br /> <br />features as may be necessary to accommodate traffic <br />without direct compensation, except as provided in <br />(a) and (b) below. <br />(a) Approved Detours. Thecostofconstructing <br />detours, temporary bridges, and the removal <br />of temporary bridges, and obliteration ofthe <br />detour road will be paid for at the appropriate <br />unit bid prices for the items of work involved. <br />Maintenance. requirements, as approved, <br />will be paid for by the appropriate bid item; <br />however, if a bid item does not exist, then <br />payment will be made as provided in sub- <br />section 104.03. <br />(b) Maintaining Traffic During Suspension of <br />Work. During any suspension ordered by <br />the Engineer in accordance with subsection <br />105.01, the Contractor shall open to traffic <br />the portions of the project agreed upon <br />between the Contractor and the Engineer. <br />Prior to allowing traffic on the project, the <br />Contractor shall prepare the roadbed so that <br />it will safely and adequately accommodate <br />traffic. During the suspension period, the <br />maintenance of the roadway will be the <br />responsibility of the Division. When the <br />suspension is lifted, the Contractor shall <br />renew any work or replace materials lost or <br />damaged on the project and shall remove, as <br />directed, work or materials used during the <br />suspension. The Contractor shall complete <br />the project as though the prosecution of the <br />work had been continuous and without <br />interference. All additional work caused <br />during the suspensions, for reasons beyond <br />the Contractor's control, will be paid for as <br />provided in subsection 104.02 when contract <br />unit prices exist, or as extra work as provided <br />in subsection 104.03 when no unit price <br />exists. <br />(c) Maintaining Traffic During Free Time. <br />During the free time period, as provided in <br />subsection 108.06, the Contractorshall berespon- <br />sible for maintaining traffic control items as <br />long as construction operations interfere <br />with traffic. When construction operations <br />which interfere with traffic cease, the Con- <br />tractor shall notify the Engineer, in writing, <br />and shall adhere to the same procedures as in <br />paragraph (b) above. The Contractor shall <br />notify the Engineer, in writing, when con- <br />struction operations which interfere with <br />traffic will resume and shall resume respon- <br />sibility for maintaining traffic. <br />(d) Maintenance Directed by the Engineer. If <br />the Engineer directs special maintenance for <br />the benefit of the travsling public, that is not <br />included in the Contract, the Contractor will <br />be paid for as provided in subsection 104.02 <br />when contract unit prices exist, or as extra <br />work, as provided in subsection 104.03, when <br /> <br /> <br />10 <br /> <br />