Laserfiche WebLink
<br />I <br />I.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I~ <br />I: <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br /> <br />INTRODUCTION <br /> <br />In 1973, the City of Littleton received a federal grant to prepare a drainageway <br />master plan for Slaughterhouse Gulch. The City retained the engineering firm <br />of Frasier and Gingery, In~., to carry out the planning and preliminary design <br />required to identify and resolve the potential flood hazards within the <br />Slaughterhouse Gulch study area. The attached interim report includes evaluation <br />of the identifiable drainage problems on the gulch, and recommends alternative <br />solutions. <br /> <br />Because of possible effects the project may have, a statement is required <br />analyzing adverse or beneficial impacts on the environment. The following report <br />is intended to provide an analysis of these impacts and to preclude or minimize <br />potential adverse effects of the project. <br />