Laserfiche WebLink
<br />LYONS COLORADO FLOOD HAZARD MITIGA TJON PLAN <br /> <br /> <br />NCCC and OEM workers cementing glllss blocks into <br />a basement window frame. <br /> <br /> <br />OEM and NCCC workers constructing afloodwalL <br /> <br />The work began on Oct. 25, and was <br />completed on Nov. 10. A team of 12 <br />NCCC workers was provided. OEM <br />appointed an employee to monitor the <br /> <br />structural work performed. The NCCC <br />workers supplied picks and shovels and <br />OEM. provided glass blocks, cement, <br />lumber, wheel barrels, saws and drills. <br /> <br />Aside from bad weather delaying the time <br />schedule, everything ran smoothly. The <br />work team demonstrated great <br />commitment, enthusiasm and cooperation. <br />With this project, a bond was created <br />between OEM and the NCCC, as well as <br />between a federal community service <br />program and the town of Lyons. It also <br />gave the NCCC a high profile within the <br />Lyons community which may be looked <br />upon as an example for future NCCC <br />servIces. <br /> <br />18 <br />