My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00567
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:42 PM
Creation date
10/4/2006 9:21:54 PM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Community
Lyons
Title
Lyons Flood Hazard Mitigation Plan: The August 10, 1994 Flood
Date
9/1/1994
Prepared For
Lyons
Prepared By
Town of Lyons, Colorado Office of Emergency Management
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LYONS COLORADO FLOOD HAZARD MITIGATION PLAN <br /> <br />Homeowner permission was needed for <br />conducting site profiles in order to <br />determine the mitigation needed for each <br />property. OEM provided flood information <br />packets containing Right of Entry <br />Agreement Forms (which allowed OEM <br />employees to enter a premises) and Site <br />Profile Forms (which were used to record <br />observations and make suggestions for <br />mitigation). <br /> <br />On Oct. 15, representatives from the ARC, <br />OEM and the Boulder County Sheriffs <br />Department organized and presented, to the <br />flood victims, a general overview of the <br />NCCC program and the various types of <br />structural mitigation that could be done. <br />The information packets were also handed <br />out at this time. It was stressed that the <br />NCCC's work would be at no charge to <br />property owners and agreement of <br />participation would be decided <br />independently by the owners. <br /> <br /> <br />Working days always beg{llf with a project pltur {llfd <br />discussion. <br /> <br />Structural Mitigation <br /> <br />OEM. began conducting site profiles. A list <br />of materials and equipment, along with <br />time and cost estimates was prepared for <br />each property surveyed. Any costs <br />incurred during this project would be <br />absorbed by OEM with funds from the <br />University of Colorado, Colorado Springs, <br />Center for Community Development and <br />Design. The Department of Local Affairs <br />and Division of Local Government would <br />supply required resources and technical <br />expertise needed during this project. <br /> <br />After site profiles were summarized, OEM <br />determined the following mitigation efforts <br />were needed at the various sites: <br /> <br />:~rf:~~~j@ <br /> <br />;::::::::::::::;:::::;:;:::::?-::::~:8 <br />...,..................'........."...... <br />:::':':::::':::::::::;:::::;::':::'::;::::::::'::$::::::::,:::::,:::,: <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.