Laserfiche WebLink
<br />BE IT FURTHER RESOLVED that the Board does hereby designate and approve as approximate <br />floodplain information the l00-year floodplain as described by the approximate floodplain delineation <br />in said new report, dated March 2, 1989, for the stream reach listed in Table 4; and <br /> <br />BE IT FURTHER RESOLVED that the Board does hereby designate and approve as storm or <br />floodwater runoff channels or basins those areas descnbCd by the approximate floodplain delinations in <br />said new report dated March 2, 1989, except the appro~e floodplain delineations for-lakes. ponds. <br />reservoirs and overflows from irrigation ditches, and ~ descnbed by the hydrologic procedure for <br />estimating loo-year peak flows as described in the HydrologU: Addendum for Approximate <br />Floodplains dated August 1996, utilizing, as appropriate, the regression equation for Arkansas River <br />Basin Subregion ARK-I for those stream reaches in Subregion ARK-I (Eastern Plains Subregion), <br />the regression equation for Arkansas River Basin Subregion ARK.3 for those stream reaches in <br />Subregion ARK-3 (Central Foothills Subregion), the regression equation for Arkansas River Basin <br />Subregion ARK4a for those stream reaches in Subregion ARK4a (Northern Foothills Subregion <br />West of Monwnent Creek and Fountain), and the regression equation for Arkansas River Basin <br />Subregion ARK4b for those stream reaches in Subregion ARK4b (Northern Foothills Subregion <br />East of Monument Creek and Fountain), as described in the Guidelines for Determining 100-Year <br />Flood Flows for Approximate Floodplains, only for those approximate stream reaches that have <br />drainage areas equal to or larger than the lower lirnits for the use of the Guidelines for Detennining <br />lOO-Year Flood Flow:> for Approximate Floodplain.., except for the approximate study reaches <br />included in Tables 3 and 5, contingent upon the undewtanding that EI Paso County and the EI Paso <br />Regional Building Department will regulate the approxinlate floodplains on a case-by-case basis subject <br />to a detailed hydrologic and hydraulic analysis performed by a professional engineer, in accordance <br />with the determinations of the Colorado Water ConserVation Board regarding the applicability of the <br />Guidelinesfor Detennining 100-Year Flood FlowsforApproximate Floodplains; and <br /> <br />BE IT FURTIffiR RESOLVED that the Board does hereby designate and approve as storm or <br />floodwater runoff channels or basins those areas described by the approximate floodplain delineations <br />in said new report dated March 2, 1989, except the 3pproximate floodplain delineations for lakes. <br />ponds. reservoirs and overflows from irrigation ditches, and as described by the hydrologic procedure <br />for estimating lOO-year peak flows as described in we HydrologU: Addendum for Approximate <br />Floodplains dated August 1996, utilizing, as appropffilte, the regression equations contained in the <br />U.S. Geological Survey publication, Techniques For E$timating Regional Flood CharacteristiJ:s of <br />SmaU. Rural Watersheds in the Plains Region of Eastern Colorado, as endorsed by the Guidelines <br />for Detennining 100-Year Flood Flows for Approxinll1te Floodplains, only for those approximate <br />stream reaches which have drainage areas less than the lower limits for utilizing the regression <br />equations for Arkansas River Basin Subregions ARK-I, ARK-3, ARK4a and ARK4b, as set forth <br />in the Guidelines for Detennining 100- Year Flood FWws for Approximate Floodplains, but which <br />have drainage areas greater than the lower limit for utilizing the regression equations for Arkansas <br />River Basin Subregions ARK-I, ARK-3, ARK4a and ARK4b contained in the U.s. Geological <br />Survey publication, Techniques For Estimating RegiOnal Flood Cho.racteristiJ:s of SmaU. Rural <br />Watersheds in the Plains Region of Eastern Colortulo, 0.5 square mile, except for the approximate <br />study reaches included in Table 5, contingent upon the lInderstanding that EI Paso County and the EI <br /> <br />11 <br />