Laserfiche WebLink
<br />I <br />I TOWN OF MEEKER <br />I SULPHUR CREEK FLOOD CONTROL PROJECT <br /> PHASE II IMPROVEMENTS <br />I BID SCHEDULE <br /> LOCATION ESTIMATED TOTAL <br />I ITEM/DESCRIPTION (STATION) QUANTITY PRICE <br />I 1. Rock Rip-Rap 1 +93 - 2+50 105 Cu. Yd. <br /> Access Road and Misc. Site Work <br /> 2. 1 +90 - 4+00 Lump Sum <br />I 3. Remove Baffle Blocks 2+50 - 2+58 Lump Sum <br />I 4. Relocate Guard Rails 5+90 -6+10 Lump Sum <br /> 5. Replace Blow-off with Hydrant 6+12 Lump Sum <br />I <br />6. Concrete Channel 4+00 - 8+95 215 Cu. Yd. <br />I 7. Driveways and Misc. Site Work 4+00 - 8+95 Lump Sum <br />I 8. Gravel for Driveways 4+00 - 8+95 90 Tons <br />I 9. Concrete Retaining Wall 10+75-11+55 24.7 Cu. Yd. <br />10. Rock Rip-Rap 10+75-11+80 140 Cu. Yd. <br />I 11. Concrete Ditch Crossing Structure 19+ 15 - 19+95 84 Cu. Yd. <br />I 12. Ditch Pipe and Supports, etc. 19+45 - 19+65 Lump Sum <br />I 13. 4 ft. Chain Link Fence 19+30 - 19+80 SO Feet <br /> Grouted Rock Rip-Rap <br /> 14. 19+ 10 - 20+65 150 Cu. Yd. <br />I 15. Non-Grouted Rip-Rap 19+80 - 20+60 38 Cu. Yd. <br />I 16. Rip-Rap Provided by Town (Credit) 50 Cu. Yd. <br />I Total Bid: <br />I <br /> <br />