My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00301
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:57 PM
Creation date
10/4/2006 9:11:49 PM
Metadata
Fields
Template:
Floodplain Documents
County
Boulder
Stream Name
South Boulder Creek
Title
South Boulder Creek/ Flatirons
Date
12/5/1997
Prepared For
Boulder
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />~. <br /> <br />. <br /> <br />. <br /> <br />. Rcsidents of the South Boulder Creek floodplain will havc to bc notified of the flood risks <br />prior to this years flood scason. Thc public needs to be informed of the flood hazards. <br /> <br />. The flood warning plan for South Boulder Crcck could be updated to include residcnts in the <br />unmapped portion of the floodplain. <br /> <br />. All entities at the meeting agreed to cooperate and participate in a master planning cffort <br />which would address long-term mitigation strategies for South Boulder Creek. The Urban <br />Drainage and Flood Control District will need participants to agree on a scope-of-work, <br />funding shares, and schcdule. It is possible to go dircctly into master planning and <br />implementation, and by-pass the map revision process in thc immediate future. <br /> <br />. FEMA should not initiatc a map rcvision of thc South Bouldcr Crcek floodplain until the <br />Icvce certification process is complete. If the levee certification is granted, the existing <br />floodplain mapping along the property, which already assumcs a lcvee, will be fairly <br />accurate. If the levee ccrtification is not grantcd, then thc floodplain should be redefined to <br />reflect "without levce" conditions. In either case, the additional floodplain areas downstream <br />of the levee (i.e. Keewaydin subdivision) should be appropriately mapped. The mapping <br />update could either takc place I) after the levee certification process and before the master <br />planning process, or 2) after the levee certification process and aftcr thc master <br />planning/implementation process. <br /> <br />Thcse meeting minutes werc prepared by Colorado Water Conservation Board staff, and reflect <br />pertinent discussion items during the meeting held on February 14, 1997. Please contact Larry <br />Lang or Tom Browning at (303) 866-3441 if you have any qucstions, commcnts, or concerns <br />regarding thcsc meeting minutes. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.