My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00281
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:58 PM
Creation date
10/4/2006 9:11:07 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Greeley
Title
Design Criteria and Construction Specifications volume 2 of 5 Storm Drainage Criteria
Date
10/1/1997
Prepared For
Greeley
Prepared By
Department of Public Works
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. Plan Portion: <br /> <br />a. North Arriow <br />b. Property lines <br />c. Easement :Limits with Dimensions <br />d. Ownership of Subdivision Information <br />e. Street Names <br />f. All Existing Utilities <br />g. All Topo~Jraphic Features (hous'es, curbs, water <br />courses, 4~tC.) <br /> <br />3 . Proposed Faci l:L ties: <br /> <br />a. Storm se~lers, inlets, outlets, and manholes with <br />pertinent elevations, dimensions, type, and <br />horizontal control indicated. <br />b. CUlverts, end sections, and inllE!t/outlet protection <br />with dimensions, type, elevations, and horizontal <br />control indicated. <br />c. Channels, ditches, and swales (including side and/ <br />or back yard swales) with len9ths, widths, cross- <br />sections, and erosion control (i.e. riprap, <br />concrete, grout) indicated. <br />d. Check structures, channel drops, erosion control <br />facili tiesl. <br />e. Detention pond grading, trickle channel, outlets, <br />and landscaping. <br />f. Other drainage related structurlE!S a.nd facilities <br />(including underdrains and sump pump lines). <br />g. Maintenance access considerations. <br />h. Over lot grading. <br /> <br />4. Profile Information: <br /> <br />a. Stationinqr <br />b. Elevations at the city of Greeley Datum <br />c. Length Between Structures and Connections <br />d. Slope of Pipe <br />e. Existing Ground Profile <br />f. Proposed Ground or Street Profi.IE! <br /> <br />The information required for the plans shall be! i.n accordance with <br />sound engineering principles, these Critericl, and the City <br />requirements for SUb-structural, foundation, bedding, hydraulic, <br />landscaping, and other details as needed to construct the storm <br />drainage facilities. The approved Final Plan siha,ll {le included as <br />part of the construction documents for all fac:ilitie,s affected by <br />the drainage plan. Construction plans shall be signed by a <br />registered professional emgineer as being in accordance with the <br />City approved drainage reports/drawings. <br /> <br />2 - 12 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.