Laserfiche WebLink
<br />Representative 9hris Paulson <br />February 17, 1988 <br />Page two <br /> <br />authorized projects. In the Board's view, it would not be wise <br />to expend money for the study should a substantial sum be <br />borrowed from the construction fund again this year. <br /> <br />Second. you asked ir it would not be more feasible to wait <br />until the study now being performed by the Co1.orado Water <br />Resources Research Institute is finished in order that its <br />results might be made available for use in any study with which <br />the Legislative Council would authorize the Board to proceed. <br />It appears to the Board that the study being performed by the <br />Institute is. indeed, duplicative of a major portion of the <br />study which was authorized by S.B. 15. Therefore. the Board is <br />or the opinion that it would save money to wait until the <br />Institute study is done before embarking upon the study <br />authorized by S.B. 15. <br /> <br />If you would like any additional information or input from <br />the Board. please do not hesitate to call upon us. <br /> <br />Sincerely. <br /> <br />~ <br /> <br />J. William McDonald <br />Director <br /> <br />JWM/gl <br />Enclosure: as stated <br />cc: Members. CWCB (w/o enc.) <br />