My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00067
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:32:44 PM
Creation date
10/4/2006 9:01:59 PM
Metadata
Fields
Template:
Floodplain Documents
County
Alamosa
Community
Alamosa
Stream Name
Rio Grande River
Title
Flood Control Status Report for Alamosa County and City
Date
7/1/1987
Prepared For
Alamosa County
Prepared By
CWCB
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i <br />I.. <br />I, <br />I <br />I <br />I <br />I <br />I <br />1-, <br />f: <br />I <br />I <br />1 <br />I <br />I <br />1 <br />I' <br /> <br />Phase IV <br /> <br />a. Construct both the north and south tieback levees. <br /> <br />b. The Muller Engineering Study determined that the most <br />critical areas were within Phases I and II. In order <br />maximize State and local resources, the decision was <br />made to commence construction of Phase I and proceed <br />upstream to the extent of available funds. <br /> <br />Prior to the initiating construction of Phase I, a formal <br />request was made to the Albuquerque District Corps of Engineers' <br />seeking project endorsement and financial assistance for <br />completion of the project which will provide the community a <br />100-year flood protection. <br /> <br />Another heavy snowpack in the spring of 1986 caused the Rio <br />Grande to reach a peak discharge of 4,580 cfs on June 7. 1986. <br />However, due to the completion of recommended channel Clearing <br />by the Ci ty of Alamosa Publ ic Works Department and emergency <br />repairs to the golf course levee, this slightly higher flood <br />did not result in any significant damages. <br /> <br />During the fall of 1986, the levees on both sides of the <br />river between U.S. 160 and the D&RGW railroad bridge were <br />completely rebuilt under Phase I. Without these Phase I <br />improvements. it is almost certain that failure of the old <br />levee would have occurred during the 1987 snowmelt flood <br />season. On May 16, 1987, the gage at Alamosa recorded 5.200 <br />cfs or about a l2-year flood. The river remained in flood <br />stage through June 16. 1987 with a second flood peak of 5160 <br />cfs on that date. The willow mowing and channel Cleaning <br />during 1985 saved an estimated $315.000 in potential flood <br />damages during the 1986 flood peak. The levee improvements in <br />Phase I during 1986 saved an additional $315,000 in potential <br />flood damages during the 1987 flood peak. The total savings to <br />Alamosa residents from flood damages is estimated to be <br />$630.000. (based on Muller Engineering's "Summary of Flood <br />Damage Estimates and Annual Flood Risks" figure 2). <br /> <br />The total cost of the project through Phase I is approximately <br />$1.0 million. The city and the county have obtained another <br />block grant for the completion of a portion of Phase II in late <br />1987. It is hoped that the state and local monies expended for <br />Phase I and II can be used as the required matching funds under <br />a Corps of Engineers program authorized under the Water <br />Resources Development Act of 1986 for construction of Phases <br />III and IV in the near future. The Corps is expected to <br />complete their reconnaissance report by the end of October 1987. <br /> <br />. <br />. <br /> <br />viii <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.