My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00001
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:22:09 PM
Creation date
10/4/2006 8:59:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Title
Users Manual for Program PEAKFQ, Annual Flood Frequency Analysis Using Bulletin 17B Guidelines
Date
1/30/1998
Prepared By
USGS
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Ma"ufaClu'on9"'o'''P'pe <br /> <br />Central Utah Project, Utah <br /> <br />Bonneville Unit. The contractor con. <br />tinued cleanup work on Currant Creek <br />Dam. <br />Construction continued on Vat Tunnel; <br />the boring machine excavated 27.230 feet <br />of material bringing the tunnel to 63 per. <br />cent completion. <br />Rock Creek Road was completed in May. <br />Stillwater Tunnel reached 55 percent <br />completion. with 8.116 feet of material <br />excavated during FY78. <br />A contract was awarded in July for place. <br />ment of riprap at Soldier Creek Dam; the <br />contract was 46 percent complete by <br />September 30, 1978. In August. contracts <br />were awarded for the Alpine Aqueduct. <br />Section " of the Jordan Aqueduct <br />System, and the Tabiona Field Station. <br />Work on these contracts began in late <br />September. <br />Bids were opened lor buildings and <br />utilities for the Currant Creek Recreation <br />Area in September. an award will be <br />made in FY79. <br /> <br />Jensen Unit. The outlet works tunnel <br />lining for Red Fleel Dam was completed <br />in April. Although outside operations <br />were shut down for wmler between <br />February and April, work on the dam was <br />about 56 percent complete al the end 01 <br />the fiscal year. <br />Vernal Unit - Work began on the BlOCk 4 <br />drains in FY78. The work was 96 percent <br />complete at the end of the year. <br />4 <br /> <br /> <br />O'dhng o"Jo.oja" "quetlucl Syslem <br /> <br />Construction CostS. Annual and Accumulated <br /> <br /> Annual Accumulated <br />Fiscal year 1968 $51.785,180 $771,955,084 <br />As of 6130168 <br />Fiscal year 1969 44,128,461 <br />As of 6130169 816,083,545 <br />Fisca! year 1970 38,517,800 <br />As of 6130170 854.601,345 <br />Fisca' year 1971 30,443.914 <br />As 01 6130171 885,045,259 <br />Fiscal year 1972 43,187,756 <br />As 016l30f72 928.233,015 <br />Fiscal year 1973 46.588.918 <br />As of 6130173 974.821.933 <br />Fiscal year 1974 36.986,459 <br />As 01 6130174 1,011,808,392 <br />Fiscal year 1975 52.303,718 <br />As of 6130175 1,064,112,110 <br />Fiscal year 1976 70.281,741 <br />As of 6/30176 1.134.393,851 <br />Transitional Quarter and <br />liscal year 1977 '131,750.705 <br />As Of 9/30177 '1.266.144,556 <br />Fiscal year 1978 89.001.375 <br />As 01 9/30178 1,355,145,931 <br />.".C'''''''''''...M........'Q....._.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.