My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00001
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:22:09 PM
Creation date
10/4/2006 8:59:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Title
Users Manual for Program PEAKFQ, Annual Flood Frequency Analysis Using Bulletin 17B Guidelines
Date
1/30/1998
Prepared By
USGS
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />~". <br />". <br /> <br />(" <br /> <br />" <br /> <br />-. <br /> <br />. ......---.'- <br />' " <br />" ~'....-..,.. ~. <br />~ . ,< ,1~,.. >) '-. <br />."\.,~"-...~ ,,~, <br />',... " . .....'.,-y <br />~~..J' ~~" . _ ';~,t(.l <br />.~~:."" "" ":<1+';:.~ <br />' .-. . ,'-' .:i#W,kl;J" ~', <br />- ...- - "f,r' '.,...... '. ."~ <br />~ "', ."J,J~'f'~" '. . ..:.' <br />J '? _,...-t;~ ~.'. <br />.J .",,0.:.":, .;:!.')~ <br />~ '( ~. .. '-', " <br />,- \:' ",C'"-. <br />. . <br /> <br />.. <br /> <br />SCll'''cFlam'ngGOfg'''LA~e <br /> <br />fill, while others regained the storage <br />loss caused by drought and drawdown in <br />FY77. <br /> <br />An agency-wide Dam Safety Program <br />and Public Involvement Program were <br />established in FY78. <br /> <br />Revenues of $9,492.543 were received in <br />FY78, and forwarded to the National <br />Treasury. Of this total, $9,197,103 was m. <br />teres I payments: the $295,440 balance <br />was applied as payment on investment. <br />Most of the revenues were derived from <br />power sales - gross generation for <br />FY78 was 4.5 billion kilowatt.hours. <br /> <br />Construction Activities <br /> <br /> <br />FlamIng Gorge Dam. Ut.... <br /> <br />Colorado River Storage Project <br /> <br />Curecanti Unit - The contractor con. <br />tinued cleanup work on Crystal Dam; <br />only minor work remains. <br /> <br />Work on the electrical completion <br />contract was accepted as substantially <br />complete in April. <br />Clearing of Crystal Reservoir was essen. <br />tially complete by the end 01 the fiscal <br />year. <br />Crystal Powerplant began generating <br />power in June. <br />Rock removal above Blue Mesa Power- <br />plant was completed by the end 01 the <br />fiscal year. <br />A contract lor wood pole inspection and <br />treatment was awarded in May. <br /> <br />Flaming Gorge Unit. The Flaming Gorge <br />ViSitor Center Building addition was <br />completed in July. <br />The power Intake modifications on <br />Flaming Gorge Dam were completed in <br />September. <br /> <br />Dallas Creek Project, Colorado. A con. <br />tract for Ridgway Field Station was <br />awarded in February and completed in <br />August. <br /> <br />Dolores Project, Colorado - A contract <br />was awarded for the McPhee Dam ac. <br />cess road. part 1, in May. The contract <br />was 90 percent complete by the end of <br />FY78. <br /> <br />Emery County Project. Utah. Work on <br />Block No.3 drainS was completed in <br />February. <br /> <br />Lyman Project, Wyoming. Excavation of <br />the cutoff trench and ouUet works for <br />Stateline Dam was completed, and work <br />on the embankment was started. About <br />76 percent of the embankment had been <br />completed by the end of the fiscal year. <br />The Ilrst concrete placement lor the still. <br />ing basin was made in September 1977; <br />the last in September 1978. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.