My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00001
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:22:09 PM
Creation date
10/4/2006 8:59:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Title
Users Manual for Program PEAKFQ, Annual Flood Frequency Analysis Using Bulletin 17B Guidelines
Date
1/30/1998
Prepared By
USGS
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />SludenlS I'om ra,m., near Roosevelt UlaM <br /> <br />volved in CRSP planning have increased <br />their awareness of social aspects aflecled <br />by prOject development. <br /> <br />Cultural Resources <br /> <br />Dolores projecl: In FY78, the Anasazi <br />ArCheological District was determined to <br />be eligible for the National Register of <br />Historic Places: a Memorandum of Agree- <br />ment was signed by the Upper Colorado <br />Region, the State of Colorado, and the <br />Advisory Council on Hlstonc Places: and <br />the contract for the Cultural Resources <br />Mitigation Program was awarded to the <br />University of Colorado on June 6. <br /> <br />Thus far, more than 750 Anasazi arCh. <br />eological sites have been localed Within <br />the boundary of the Anasazi ArCh. <br />eological District (whJch coincides with <br />the administrative boundary of McPhee <br />Reservoir). The Young Adult Conservation <br />Corps Camp associated With the project <br />was given the task of locating additional <br />sites, When survey work is completed In <br />1982. it is likely lhat more than 1500 sites <br />will have been discovered Within the proj- <br />ecl area. <br /> <br />The Memorandum of Agreement specifies <br />appropriate mitigation for any adverse im. <br />pacts the project causes on signiflcanl <br />cultural resources. This mitigation pro- <br />gram is directed toward 1) avoiding <br />damage to cultural resources and pre. <br />serving them when possible: 2) recoyenng <br /> <br />Youth Programs <br /> <br />~~ <br />~ ~., ~- .~r-.-.~t! <br /> <br />.,~~.....~~~. <br />~_..... . - . : .~' -~';'-:;.j <br />" ,'.;"'. ,,' .- <br />" ..._~,~..... . <br />. ~,~, ,~- -.' '.i- <br />- ~." c. -"to.......-..::... <br />._'7:;:;;; _:. 'o:L..,-" - <br />1: '. -~ ,:..t" <br />-*-;---' _.~ ~;.:-- <br />. --.' <br />-.UI.-~~~. <br /> <br /> <br /> <br />....-' 061 <br /> <br />information samples from sites thaI will <br />be destroyed by the project; and 3) pro. <br />Yiding storage and curatorship for the <br />information and malerials recoyered. <br /> <br />The original cost estimates also were <br />revised during FY78. The new eslimate 01 <br />approximately $6 million accounts for the <br />seyen.fold increase in sites expected and <br />for the proyision for storage and curator. <br />ship of dala and malerials. This cost in. <br />crease exceeds the authonzed 1 percent, <br />and CongreSSional authorization for <br />spending additional tunds will be <br />necessary belore a minimally adequate <br />mitigation program can be completed. <br /> <br />Cultural resources planning continued for <br />other participating projects under pre. <br />viously ellisting contracts. Location and <br />identIfication work continued on the <br />Dominguez. West Divide. San Miguel, <br />Dallas Creek. and Animas.La Plata <br />PrOJects. <br /> <br />Job Corps <br /> <br />Water and Power sponsors centers at <br />Weber Basin (Ogdenl. Utah and COli bran, <br />Colo. Weber Basin has an assigned <br />strength 01 240 enrollees. and Coltbran's <br />assigned strength is 200. Both centers of. <br />fer construction trades lraining and work <br />closely with the trade unions. Typical <br />lrade offeflngs include brick and cement <br />masonry; heayy equipment operatIon, <br />maintenance. and repair; painting: carpen- <br /> <br /> <br />,6.,'cMoo1OO'Cal'l1\15dlvul\len,sta'y <br /> <br />try: welding: electrical, plumbing, and <br />cuslodial building maintenance; ware. <br />housing: and culjnary arts. The appraised <br />yalue of the work programs in FY78 was <br />$1.611.200. The accumulaled value of the <br />work accomplished since fiscal year 1966 <br />is $10,158.200. <br /> <br />Youth Consef'Yation Corps (YCt) <br /> <br />Waler and Power sponsored liye YCC <br />camps during fiscal year 1978. The camps <br />had a total ot 204 enrollees. These sum. <br />mer camps were located at Soldier Creek. <br />Utah: Fonlenelle, Wyo.: and Cortez. <br />Durango. and Grand Junction. Colo. The <br />conservation work prOjects completed by <br />the fiye YCC camps in FY78 had an ap. <br />praised yalue of $378,953. <br /> <br />Young Adult Consef'Yation Corps (YACC) <br /> <br />Water and Power opened two Young <br />Adult Conservation Corps camps - one <br />in Linden, Utah (Central Utah). and the <br />other in Cortez. Colo. - in FY78. The <br />Central Utah Camp. with 150 enrollees. <br />performed recreational work programs in <br />support of the Central Utah Project. The <br />Cortez Camp's 20 enrollees conducted ar. <br />cheological field work in support of the <br />Cortez PrOjects Office. The appraised <br />yalue of both camps' work in FY78 was <br />S61'.657. <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.