My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02642
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:43 PM
Creation date
10/4/2006 7:18:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
Flood Section - Floodplain Designations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;. <br /> <br />e <br /> <br />e <br /> <br />tit <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone, (3031 866.3441 <br />FAJ(' (303) 866.4474 <br /> <br />STATE OF COLORI\DO <br />A <br />WI <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br /> <br />James $. Lochhead <br />Execulive Director, DNR <br /> <br />Oaries C. lile, P.E. <br />Director, CWeB <br /> <br />TO: Colorado Water Conservation Board <br /> <br />FROM: Larry Lang <br /> <br />DATE: January 21,1998 <br /> <br />SUBJECT: Agenda Item 4a.i., January 28-29, 1998 Board Meeting- <br />Floodplain Designations <br /> <br />INFORMATION <br /> <br />The Colorado Water Conservation Board at its November 24, 1997 meeting, received testimony <br />from the staff and Mr. Wayne Bethurum regarding his development. His company is <br />constructing a residential development in the City of Sterling, Colorado. This designation and <br />approval action is under consideration due to the hydrologic and hydraulics changes that were <br />witnessed during the July 30, 1997 flood event throughout the development. The flood event <br />demonstrated that the 100-year floodplain as previously designated and approved by the Board is <br />not representative of the 100-year floodplain. The existing designated 100-year floodplain is <br />presented in the floodplain report entitled "Floodplain Information Report; City of Sterling, <br />Floodplain Analysis, Pawnee Creek Overflows, prepared by Icon Engineering, Inc. dated <br />February 3,1997". The Board's approval and designation action of the 100-year floodplain <br />information in said report was by Floodplain Resolution No. 97-456. This action was at the <br />request of the City of Sterling, Colorado. A copy of my November 24-25, 1997 memorandtun, <br />which explains the staff's concern, is attached. <br /> <br />DISCUSSION <br /> <br />During the discussions of the matter at the November 24,1997 Board meeting, Mr. Bethurum's <br />Engineer, ICON ENGINEERING, INC. presented a revision to their February 3, 1997 floodplain <br />report. The new report is entitled "South Point Subdivision, Flood Impact Study Pawnee Creek <br />Overflows, dated November 23, 1997". It was presented to the staff at the Board meeting; <br />therefore, staff could not make a statement regarding the accuracy of the data and whether the <br />information met the Board's requirements for the designation as the 100-year floodplain within <br />State of Colorado. <br />
The URL can be used to link to this page
Your browser does not support the video tag.