Laserfiche WebLink
<br />3. The District will have obtained all permits necessary for project construction. <br /> <br />4. A carriage contract will have been successfully concluded between the US <br />Bureau of Reclamation and the District for the delivery of WETP ACK <br />irrigation project water in Dolores Project facilities. <br /> <br />. <br /> <br />Cc: . John Porter, DWCD <br />Steve Harris, Harris Water Engr. <br />Linda Bassi, AGO <br /> <br />Attachments <br /> <br />. <br /> <br />. <br /> <br />6 <br /> <br />i <br />, <br />