<br />The District completed a reconnaissance study for WETP ACK in November 1998. <br />Several of the concepts developed in the reconnaissance study were investigated further <br />in the feasibility study, which has been prepared for the project as presented here. The <br />feasibility study was prepared with a $75,000 Construction Fund loan and was conducted <br />by the District in cooperation with Harris Water Engineering of Durango. <br /> <br />Proiect Summary <br /> <br />The project involves a system of pipelines, pumps and related facilities to deliver water to <br />the District's Dove Creek Canal system for the irrigation of 4,000 acres of new lands that <br />are presently dry land farmed. Water will be delivered to irrigators in pipes under <br />pressure for sprinkler irrigation only. The major facilities and the locations ofthe <br />proposed irrigated areas are shown on the attached figure. A presentation on the technical <br />features of the project will be made at the November 20th Board meeting. <br /> <br />Water for the project will be obtained by the purchase of shares in the Montezuma Valley <br />Irrigation Company (MVIC) and by the acquisition of Totten Reservoir (3,300 acre-foot <br />capacity), which is presently owned by MVIC. All MVIC water rights are decreed for <br />diversions from the Dolores River. The MVIC shares will be used directly for diversions <br />to the new lands while the water in Totten Reservoir will be used for exchange in the <br />southern portion of the District's water supply system. <br /> <br />Adequate water will be provided for full service irrigation as defined by the District. <br />Shortages will occur in some years. Monthly operations studies were conducted for an <br />historic period of record, which included a five-year drought. The operations studies <br />indicate an estimated yield of7 ,840 acre-feet per year in most years. <br /> <br />The costs for acquisition ofMVIC water and Totten Reservoir are $2,2S0,000. <br />Construction costs, escalated for inflation over four years, are conservatively estimated at <br />$S,817,000 for a total project cost of $8,067,000. Costs are itemized by major category in <br />the table below. The costs in the table have not been escalated for inflation during <br />construction. <br /> <br />The District is in the process of acquiring MVIC water and hopes to complete acquisition <br />in early 2001. Construction is scheduled to begin in 2002 and would be done in stages <br />over a period offour years. <br /> <br />Dolores Irrigation Project Cost Summary <br />Year 2000 $ <br /> <br />Item Estimated Cost <br />Pipelines, pumps and other facilities $3,837,000 <br />Engineering, admin. and contingencies $1,227,000 <br />Total estimated construction cost $S,064,000 <br />MVIC shares and Totten Reservoir $2,250,000 <br />Total costs $7,314,000 <br /> <br />2 <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br />