My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02614
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02614
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:27 PM
Creation date
10/4/2006 7:17:52 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
Flood Section - South Platte River Channel Project - Right-of-Way Action
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Littleton, Littleton Police and Fire Departments, and the Air Life HealthONE Foundation have . <br />pledged resources for the accomplishment of the project. CWCB Staff has a complete copy of <br />the proposal for the project. <br /> <br />Staff reviewed the proposal on the June 8, 1998 with the applicants and fmd that the proposal is <br />compatible with the "operation and maintenance" responsibilities of the Board for the flood <br />control project. <br /> <br />Use for the Requested Area is for the construction of the memorial rest stop and park complex <br />on a 40 foot x 140 foot requested easement. If granted, the easement will restrict any future <br />easements/activities within the CWCB project ROW because the complex has fixed features in its <br />proposed design. <br /> <br />Conditions for the Easement - If the easement is granted, the owner shall comply with the <br />following conditions: <br /> <br />1) TIME PERIOD - The EASEMENT shall be for a term of 25 years. <br /> <br />2) PERMITS - The owner shall be responsible for securing and monitoring all required <br />federal, state, and local permits pertaining to Colorado waters and streams. <br /> <br />3) <br /> <br />INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and <br />shall have coverage in the amounts established by the Colorado Governmental Immunity <br />Act - part one of article 10 oftitJe 24, lOa C.R.S., as amended. <br /> <br />. <br /> <br />4) FEE CONSIDERATIONS - A recommendation will be made that is a waiver from the <br />standard fee consideration. <br /> <br />5) RECLAMATION OF THE SITE - A reclamation plan shall be developed and provided <br />to the CWCB for approval prior to the completion of the project. <br /> <br />6) NON-EXCLUSIVE EASEMENT CLAUSE - Language will be stated in the easement <br />that will reserve the CWCB's right to excess the area; however, no additional easements <br />will be granted on the same land covered by this easement. <br /> <br />REQUESTED EASEMENT <br /> <br />Action Requested: <br />For the Air Life Division of Health One request, an easement is requested for the construction of <br />the "The Air Life Platte River Memorial Park" within the CWCB project right-of way (ROW). <br />The staff recommends an easement area of approximately 40' x 140' which is located adjacent of <br />the Board's westerly ROW line and five feet off the westerly limits of the traillbike path. <br /> <br />2 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.