My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02546
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:56 PM
Creation date
10/4/2006 7:17:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/9/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~j~ <br /> <br />mass concrete. Another unique feature of the <br />Morrow Point Dam and powerplant is that we <br />are proposing an underground powerplant at <br />this site. It will house two 60,OOO-kw generat- <br />ing units. This is the first underground power- <br />plant that the Bureau of Reclamation has ever <br />constructed. <br /> <br />I <br /> <br />Moving on to the transmission system under <br />the Storage Project, all transmission lines <br />sCheduled to be constructed at the present time <br />are under contract. The ll5-kv line from Blue <br />Mesa to Gunnison is completed and in operation, <br />delivering power to the Blue Mesa Dam site. <br />The Flaming Gorge-Rangely l38-kv line is also <br />completed. The next item under the transmis- <br />sion system is the construction of the major <br />substations. The contract for the pinnacle <br />Pe~c Substation was awarded on November 30th. <br />Bids will be opened tomorrow for the Curecanti <br />Substation. They are scheduled for opening on <br />the Hayden Substation on February l4th and bids <br />are scheduled for call on the Shiprock Substa- <br />tion in late January or early February. <br /> <br />Plans for the construction of a Power <br />Operation Center at Montrose are rapidly being <br />firmed up. It is planned that this center will <br />be in operation by July l, 1964. Bids will be <br />opened on February 5, 1963 for construction of <br />a multichannel microwave radio system for <br />supervisory control of the' Storage project <br />transmission system. <br /> <br />Now moving on to the participating proj- <br />ects, paonia Dam is completed. Water was <br />stored in the dam last year and delivered to <br />the irrigators. There is some minor repair <br />work to be completed at the outlet works struc- <br />ture. Also the Smith Fork project is sub- <br />stantially completed. Water is presently being <br />stored in the Crawford Reservoir and we look <br />to be delivering 'irrigation water under that <br />project next year. However, it will be a <br />seasoning and testing year next year on all <br />the project features. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.