Laserfiche WebLink
<br />. <br /> <br />^ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />L~~:. r:~,) .~, ?:: ~'j. <br />. ..,' ,._.c. tJ <br />... '-,"' ;.loti I.l <br /> <br />caused by acquisition of the conditional right. The key deci- <br /> <br />229 <br /> <br />sions made were to limit the number of water interests evaluated. <br /> <br />Not all conditional rights will be evaluated for conflict with 230 <br /> <br />the proposed acquisitions. The Board will only evaluate those 231 <br /> <br />conditional rights "for which facilities have been construed or 232 <br /> <br />are substantially under construction." <br /> <br />The 7.20(d) and (e) interests will be evaluated for impact but 235 <br /> <br />these rights are given a somewhat different analysis in that the 236 <br /> <br />Board may acquire a conditional water right that has a signifi- 237 <br /> <br />cant negative effect on these interests if that significant nega- 238 <br /> <br />tive effect is outweighed by the environmental benefits of ac- <br /> <br />quiring the conditional right. <br /> <br />240 <br /> <br />The operational limits of 7.40 were designed to protect exchanges <br /> <br />243 <br /> <br />by a limit on the operation of the acquired conditional water 244 <br /> <br />right once it is changed to an absolute instream flow right, to 245 <br />the contemplated draft of the original right. <br /> <br />Section 8 Inundation of IFNL Rights 249 <br /> <br />Inundation of an IFNL right held by the Board is an interference 254 <br /> <br />with the Board's usufructary rights conferred by the IFNL decree. 255 <br /> <br />The purpose of this section is to provide a procedure in which 257 <br /> <br />the Board may protect the IFNL right from such non-consensual 258 <br /> <br />-8- 3 <br />