Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />-3- <br /> <br />II Considerations for flood protection and All measures must be in full compliance of Revised <br /> mitigation measures on a reduction of the the 100-ycar flood design standards <br /> regulatory floodplain <br />12 Consideration for floodplain and channel Language thai will address certain New <br /> effects for certain agricultural, recreational, agricultural 404 exemptions, in-stream flow, <br /> and environmental activities restoration, and environmental enhancement <br /> activities <br />13 Process for taking Dcsignation and Approval A. Consideratioo at a Community's NC <br /> Action Request <br /> B- Consideration at the Board's <br /> Initiative <br />14 Designation and Approval of the Regulatory A. Designation and Approval NC <br /> Floodplain Information Requirements <br /> B. Regulatory FloodIllain and <br /> Floodway <br /> C. Special conditions - <br /> AIlIlroximate or unlimited <br /> detailcd <br /> D. Notification of adopted <br /> resolutions <br />15 Change of a Designation and Approval Modification of the FEMA Letter of Map New <br /> Action for a Regulatory Floodplain Revision (LOMR) and Letter of Map <br /> Chanee (LOMC) process <br />16 Variances A. Consideration by the Board Revised <br /> B- Contents of a Request for Variance <br /> C. Factors to be considered <br />17 Incorporation by Reference The statement of basis and purpose for the Revised <br /> adoption of these floodplain designation and <br /> approval rulcs is incorporation of certain <br /> reference infonnation <br />18 Severability If any portion of these floodplain Revised <br /> designation and approval rules is found to <br /> be invalid, thc remaining portion of the rules <br /> shan remain in force and in effect. (Standard <br /> language <br />19 Mayor Encouragement Rule Recommendations to implement standards New <br /> at a higher level than these rules and <br /> regulations and better floodplain <br /> management <br />20 Revision of Rules The Colorado Water Conservation Board Revised <br /> may revise these rules in accordance with <br /> Section 24 - 4 - 103 C.R.s. <br />21 Effective date To be determined New <br /> <br />Note: Staff plans to present its first draft of the Revised Floodplain Rules at the January 2005 CWCB <br />Meeting in Denver, Colorado. A revised Rule Making Process Schedule will be presented as well. <br /> <br />Conclusion <br />The accomplishments and recommendations of the Project Advisory Committee has <br />substantially modified the "Outline for the revision of the CWCB Rules and Regulations for the <br />designation and approval of 100-year Floodplains" as presented to the CWCB at its July 20-21,2004 <br />Board Meeting. I request the Board's approval of the new and revised outline as presented in the <br />Attachment A this memorandum. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />WaWr Supply Protection. Conservation Planning <br />