My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02444
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:31 PM
Creation date
10/4/2006 7:15:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
CF Section - General and Financial Matters - Reconnaissance and Feasibility Study Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Feas. Study Projected <br /> Contract Date Date Percent <br />Appllcantll!llrrmYOr_ ~.oJocl CllunIL- Am<>unl Engineer LeallSlill Start EruI C<lmpt. <br />Feasibility Studies In Progress <br />Blue Lake Owners Association Raw Water Irrigation System Eagle 0 CWCB Staff JVS 01-Nov-97 01-Jan-99 50% <br />Boulder Lefthand Twin Lakes Reservoir Outlet Rehab. Boulder 5,000 Roc:ky Mountain Consultants JVS 01-May-98 01-Sep-98 0% <br />City of Victor Victor Dam NO.2 Dam Rehabilitation Teller 5,000 Icon Engineering WEG 23-Feb-95 01-Nov-98 50% <br />Colorado Division of Wildlife Native Aquatic Species Facility Rio Grande 0 Fishpro WEG 01-Jan-97 01-Sep-98 60% <br />Colo. Water Protective & Development Assoc. Feas. Study for Substitute Supply Plan Otero 75,000 W.W. Wheeler WEG 01-Jun-97 01-Sep-98 50% <br />Consolidated Extension Canal Co. Siphon Rehabilitation Bent 0 CWCBStaff JVS 01-Nov-96 01-Sep-96 75% <br />Crystal Lakes Water and Sewer Association North Pine Creek Reservoir Feas. Study Larimer 20,000 Resource Consultants WEG 01-Dec-91 01-Sep-98 50% <br />Jackson Lake Reservoir & Irrigation Co. Jackson Res. Dam Rehabilitation Morgan 0 W.W. Wheeler & Assoc. WEG 15-Jun-97 01-Nov-96 10% <br />Julesburg Irrigation District Harmony Ditch Diversion Structure Rehab. Logan 0 Zoyiopoulos & Assoc. JVS 01-Oct-97 01-Sep-98 25% <br />Mancos Water Conservancy District Pipeline in Inlet Channel Montezuma 0 CWCB Staff JVS 01-Nov-96 0% <br />Melvin L. Thiebaud Eureka Dam No.1 Rehab. and Enlargement Delta 0 CWCBStaff JVS 01-Nov-98 0% <br />North Poudre Irrigation Co. System Rehabilitation Larimer 1,000 Smith Geotechnic JVS 01-Nov-97 01-Sep-96 50% <br />Pagosa Area Water & Sanitation District Martinez Creek Reservoir Feas. Study Archuleta 5,000 Davis Engineering WEG 14-Nov.95 01-Sep-98 50% <br />Pagosa Springs Pipeline Company GeothennaJ Raw Water Pipeline Feas. Study Archuleta 0 City Engineer JVS 15-Nov-95 01-Nov-96 30% <br />Pine River Irrigation District Raw Water Supply System laPlata 0 Harris Water Engineering JVS 15-Oct-96 01-Sep.98 75% <br />Pine River Irrigation District Pine River Gaging Station La Plata 0 NRCS, Durango MGS 01-0ct-94 01.Jan-99 0% <br />Red Mesa Ward Reservoir and Ditch Co. Red Mesa Ward Res. Rehab and Enlrgmt. La Plata 5,000 Harris Water Engineering WEG 24-Jan-95 01-Oec-96 80% <br />San Luis VaHey Canal Co. Check Structure Rehabilitation Rio Grande 0 NRCS - Alamosa JVS 15-Nov-98 o 1-Sep-96 90% <br />Southwest Water Conservancy District Small Dam Site Reconnaissance several 9,950 Harris Water Engineering WEG 10-Aug-94 01-Sep-98 50% <br />Town of Paonia New Reservoir Reconnaissance Study Delta 5,000 Consolidated Cons. Services WEG 01-Aug-94 D1-Nov-98 30% <br />US Bureau of redamationlUS Fish & Wildlife S Grand Valley Water Management Project Mesa 0 USBR WEG 01-Nov-96 01-Sep-98 50% <br /> <br />KeY_for_Leil1Sti.ff <br />WEG = Bill Green <br />MGS = Mike Serlet <br />JVS = John VanSciver <br />lFL = Larry Lang <br /> <br />FEASIBILWK4 '. <br /> <br />P.. <br /> <br />.~ 07/09198 <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.