My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02444
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:31 PM
Creation date
10/4/2006 7:15:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
CF Section - General and Financial Matters - Reconnaissance and Feasibility Study Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> . <br />Colorado CAer Conservation Board . 09-Jul-98 . <br />Water Project Construction Loan Program <br />Feasibility Study Status Report <br /> CWCB <br /> Feas. Study <br /> Contract Date Date Percent <br />AppllcantlB.ormwer_ P...roJect County Am<>unl Engineer L..d,Stall Start End Cl>mpI. <br />FeaSibility StudIes Completed In FY 1996-97 <br />Agricultural Ditch & Reservoir Co. Welch Ditch Pump and Pipeline Jefferson 0 Bishop, Brogden & Assoc. JVS 01-Sep.96 30-Mar-9? 100% <br />Aristrocrat Ranchette Water Project, Inc. Water Shares Purchase Weld 0 CWCB Slaff JVS 01-Jan-96 01-May-97 100% <br />Bravo Ditch Co, Diversion Dam Rehabilitation Logan 0 CWCB Slaff JVS 01-Jul.96 01-Sep-96 100% <br />Buffalo Mutual Irrigation Co. Diversion Dam Rehabilitation Prowers 0 Wright Water Engineers WEG 01-Jun-96 25-Nov-96 100% <br />City of FI. Morgan Raw Water Reservoir Fess. Study Morgan 14.520 Montgomery Watson WEG 01-Jan-94 31-Jan-97 100% <br />City of Greeley Twin Lakes Dam Rehabilitation Larimer 0 ECI WEG 01.Apr-96 30-Jun-97 100% <br />City of Idaho Springs Reservoir Rehab. Clear Creek 0 Richard P. Arher & Assoc. JVS 15-May-96 28-Apr-97 100% <br />DeWeese-Dye Ditch and Reservoir Co. DeWeese-Dye Dam Rehab. Feas. Study Custer 5,000 GEl Consultants WEG 01-Sep-94 15-Jun-97 100% <br />Eagle Park Reservoir Co. Eagle Park Reservoir Rehab. Feas. Study Eagle 0 Helton & Williamsen, P.C. WEG 31-Aug-95 23-Jan-97 100% <br />Horse Creek Water Users Assoc. Purchase Water Rights ElbertlLincoln 0 WW. Wheeler & Assoc. JVS 01-Jan-97 15-Jun-97 100% <br />Lower Arkansas Water Mgt. Assoc. (LAWMA) X-V Ranch and Water Rights Purchase Prowers 65,000 Helton & Williamsen WEG 01-Jun-95 30-May-9? 100% <br />lower Arkansas Waler Mgt. Assoc. (LAWMA) Highland and Fort Bent Ditch Water Rights Purchase Prowers 65.000 Helton & Williamsen WEG 01-Maf-97 15-Jun-97 100% <br />Orchard Mesa Irrigation District Mutual Mesa Lateral Ditch Improvements Mesa 0 WestWater Engineering WEG 26-Dec.94 14-Nov-96 100% <br />Pinon Mesa Ranches Community Association Diversion Structure and Pipeline LaPlata 5,000 Wright Water Engineers JVS 01.Jan-97 15.Feb-97 100% <br />Powderhom Metro Districts I & II Robbins Reservoir Dam Rehabilitation Mesa 5.000 Landmark Engineering JVS 29-0ct-96 3Q.May.97 100% <br />Purgatoire River Water Conservancy District Trinidad Project Refinance Las Animas 0 CWCB Slaff WEG 15-Jan-97 30.Jan-97 100% <br />Sanchez Ditch and Reservoir Company Sanchez Dam Repair, Phase 2 Costilla 0 Smith Geotechnical JVS 01.Dec-96 15-Jan-97 100% <br />Summit Reservoir and Irrigation Co. Summit Reservoir Dam Rehabilitation Montezuma 1,360 Harris Water Eng & NRCS JVS 15-Nov-96 30-Mar.97 100% <br />lown of Johnstown Johnstown Pipeline Weld 0 PRC Environmental Mgt. WEG 01.Jul-93 30-Sep-96 100% <br />Town of Lyons Diversion Dam Rehab. and Pipeline Boulder 0 RBD Engineering JVS 01-Jan-96 15.Jul-96 100% <br />Town of Morrison Raw Water Diversion, Pipeline, and Res. Jefferson 0 WRC Eng.lMclaughlin WEG 12-Feb-97 100% <br />Town of Palisade Hydrology and Water Rights Analysis Phase Mesa 0 Hydrosphere WEG 15-Jan.97 15-Jun-97 100% <br />Upper Yampa Water Conservancy District Smith Ditch Headgate Replacement Rouu 0 NRCS WEG 15-Dec.96 30-Jun.97 100% <br />UpperYampa Water Conservancy District Stagecoach Reservoir Refinance Routt 0 CWCB Staff WEG 15-Sep.96 15-Nov-97 100% <br />Vouga Reservoir Association Vouga Reservoir Dam Rehab. Feas. Study Saguache 0 Woodward.Clyde WEG 01-Jan-94 09-Sep-96 100% <br />Feasibility Studies Completed In FY 1997-98 <br />AGUA Augmentation Plan Feasibility Study 7 counties 25,000 Rocky Mountain Consultants WEG 01-Mar.97 30.Jul-97 1000/0 <br />Appleton ML 350 Ditch Co., Inc. Rehabilitate Ditch with SCS/ASCS Mesa 0 CWCB Slaff MGS 01.Apr-96 25-Feb-98 100% <br />Chipperfield Lane Ditch Co. Headgate and Pipeline Garfield 0 ewcs Staffwilh NRCS JVS 01-Jun-97 15.Jul-97 100% <br />City of Fort Morgan Southern Water Supply Project Morgan 0 GronninglMontgomery Watso WEG 15-Jan-97 100% <br />City of Loveland Greenridge Glade Reservoir Enlargement Larimer 50,000 Woodward-Clyde WEG 01-Jan-85 31-Qct.97 100% <br />Cotton Creek Ditch Co. Pipeline Saguache 0 CWCB Staff with NRCS JVS 01.Jun-97 15-Jul-97 100% <br />Decker Lateral Co. Decker Lateral Rehabilitation Weld 0 CWCB Slaff JVS 31-Jul.97 15-Sep-97 100% <br />Durkee Ditch Co. Headgale Rehab. and Pipeline Delta 0 CWCB Slaff JVS 15-Sep-97 14-Nov-97 100% <br />E)-celsior Irrigating Co. Excelsior Ditch Rehabiliotation Pueblo 0 KLH Engineers JVS 15-Sep-96 15-Apr-98 100% <br />Fanners Independent Ditch Ditch Rehabilitation Weld 0 CWCB Staff with NRCS JVS 15-Sep-97 14-Nov-97 100% <br />Fanners Pawnee Canal Diversion Structure Rehab. Logan 5.000 NRCS - Sterling JVS 01-Feb-98 01-Apr.98 100% <br />Greeley and Loveland Irrig. Co. Storage and Dist. System Rehab. Weld 10,000 ECI WEG 21-Jan-97 21-Nov-97 100% <br />Hawkeye Lateral Ditch Co. Headgate Rehab. and Pipeline Mesa 0 CWCB Slaff JVS 12.Dec.97 18-Dec.97 100% <br />Morgan County Quality Water District Southern Water Supply Project Morgan 0 George Underwood, P.E. WEG 01-Sep-97 15-Sep-97 100% <br />River Oaks of the Roaring Fork POA Raw Water Irrigation System Eagle 0 CWCB Slaff JVS 15-May-97 100% <br />South PlaUe Lower River Group Lower South Platte Water Resources Investigation several 75,000 NCWCD Slaff JVS 3Q-Jul-96 01-Jul-98 100% <br />Town of Georgetown Water Rights Purchase Feasibility Clear Creek 0 Mclaughlin Water Engineers JVS 15-Nov-95 15-Jul-97 100% <br />Town of Palisade Replace Cottonwood Creek Pipeline Mesa 9,500 WestWaterlHydrosphere WEG 01-Sep-95 21-Nov-97 100% <br />Vallecilo Water Co. Treated Water Distribution System La Plata 0 Harris Water Engineering WEG 01-Sep-97 21-Sep-97 100% <br />Weldon Valley Ditch Co. Diversion Structure Rehabilitation Weld 0 CWCB Staff JVS 01-Jul.97 30-Jul-97 100% <br />Wood Lake Mutual Water & lnig. Co. Woods Lake Dam Rehabilitation Weld 3,000 Smith Geotechnical JVS 20-Nov-96 15-Jan-97 100% <br />Ute Water Conservancy District Plateau Creek Pipeline EIS Mesa Camp Dresser & McKee WEG o 1-Oec-94 15-May.98 100% <br />FEAS1B1L.WK4 Page 1 07/09/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.