Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />3. Summit Reservoir and Irrigation Company <br />Authorization: SB-97-008 <br />Water Source: Lost Canyon Creek <br />Terms of Loan: $200,000@3.75% for 30-years <br /> <br />County: Montezuma - NE of Cortez <br />Project Yield: 4,287 ac. ft. <br />Project Type: Reservoir and Ditch Rehab. <br /> <br />This $270,000 project is the rehabilitation of the Summit Reservoir Dam outlet works and the repair and <br />improvements to the Summit Reservoir and Irrigation Company's water collection and distribution facilities. The <br />Cortez office of Natural Resource Conservation Service prepared the construction plans and specifications. <br />Construction for the second to the last phase of improvements commenced in March of 1999. by Noland, Inc., of <br />Mancos, CO., and was completed in July of 1999. The final phase of improvements is scheduled to be designed <br />during the summer of 2000 with construction to follow in the fall. <br /> <br />4. Boulder & Lefthand Irrigation Company - Twin Lakes Outlet Improvements <br />Authorization: 1998 Small Project Loan Account County: Boulder - NE of Boulder <br />Water Source: Boulder Creek Project Yield: 218 adt. <br />Terms of Loan: $100,000 @ 3.75% for 15 years Project Type: Dam Outlet Improvements <br /> <br />This project is the reconstruction of the Boulder & Lefthand Irrigation Company reservoir's (Twin Lakes) <br />outlet and inlet structures and the construction of a new emergency spillway. Recent State Engineer Office <br />inspections indicate that the outlet conduit has rusted through and is functionally obsolete. Rocky Mountain <br />Consultants of Longmont are currently preparing the final design plans and specifications, with construction <br />scheduled for the fall of 2000. <br /> <br />5. Loveland. Citv of - Green Ridge Glade Reservoir Rehabilitation <br />Authorization: HE 98-1189 County: Larimer - W. of Loveland <br />Water Source: Big Thompson River Project Yield: 6.000 acre feet <br />Terms of Loan: $5,000,000 @ 4.75% for 10 yrs. Project Type: Dam enlargement <br /> <br />This $19.2 million project is the enlargement of the Green Ridge Glade Reservoir northwest of Loveland. <br />The project consists of raising the crest of the existing dam approximately 60 feet, construction of a new concrete <br />labyrinth weir spillway, and new multi-level intake gate tower outlet structure. The City has contracted with <br />Woodward-Clyde of Denver to prepare the final design and construction contract documents. Environmental studies <br />are currently underway with construction scheduled to commence in late 2001 or early 2002. <br /> <br />6. Riverside Reservoir and Land Company - Riverside Reservoir Spillwav Rehabilitation <br />Authorization: SB 98-1189 County: Weld - NW of Wiggins <br />Water Source: South Platte River Project Yield: 200 ac.ft. <br />Terms of Loan: $450,000 @ 3.75% for 20 yrs. Project Type: Spillway Rehabilitation <br /> <br />This project is the construction of an emergency spillway on the Riverside Reservoir Dam, located 11 <br />miles northwest of Wiggins in Weld County. The State Engineer has placed a storage restriction on the reservoir <br />until an emergency spillway is completed. The Riverside Reservoir and Land Company contracted with W.W. <br />Wheeler and Associates of Denver to prepare construction plans and specifications. The State Engineer's office and <br />the Riverside Reservoir and Land Company are currently evaluating alternate spillway sizes. Construction of the <br />project is currently on-hold, pending resolution of the spillway size and downstream property issues. <br /> <br />7. Riverside Reservoir and Land Company - Diversion Structure Rehabilitation <br />Authorization: HE 00-1419 County: Weld - E. of Greeley <br />Water Source: South Platte River Project Yield: 64,000 acre feet <br />Terms of Loan: $405,000 @ 4.00% for 30 yrs. Project Type: Diversion Structure <br /> <br />This project is the rehabilitation of the Riverside Reservoir and Land Company's diversion structure on the <br />South Platte River. The existing structure suffered severe damage in 1998 and again in 1999, when the river cut <br />