Laserfiche WebLink
<br />) <br /> <br />with all requirements of the permit. There are no endangered species in the site area, and no wetlands will <br />be disturbed by construction. <br /> <br />. <br /> <br />Construction of the bridge will involve excavation at the top of each river bank for construction of the <br />bridge abutments and buried riprap erosion protection, The free span design of the bridge eliminates the <br />need for a center pier, thus the channel bottom and lower banks will be undisturbed, The contractor will <br />be required to restore any disturbance created by installation of temporary access provisions for cranes, <br />No construction dewatering is anticipated, however, if water is encountered during excavation activities, <br />the contractor will be required to obtain all necessary construction dewatering permits from the Colorado <br />Department of Health and Environment. <br /> <br />The contractor will be required to install and maintain temporary sediment and erosion protection <br />measures as necessary during construction, and remove these measures at the end of the project, Upon <br />completion of construction, all disturbed areas will be :seeded and mulched, with a warranty period for <br />establishment. <br /> <br />Very truly yours, <br /> <br /> <br />) ~-:t;:- <br /> <br />. <br /> <br />) <br /> <br />. <br /> <br />P:11982182-065107900IwpICWCBeasmntltr - JMP.doc <br />