My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02386
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:04 PM
Creation date
10/4/2006 7:14:37 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/8/1972
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MR. STAPLETON: <br /> <br />MR. VELEHRADSKY: <br /> <br />MR. VANDEMOER: <br /> <br />MR. STAPLETON: <br /> <br />of these meetings went out to all newspapers, <br />news media in the area, to all federal, state, <br />and local agencies, and to all the individuals <br />we could identify that would be affected. The <br />meetings at Hinkley High covered both the <br />Cherry Creek and the Sand and Toll Gate Creek <br />projects because they were all contained in <br />one report. We felt that this was a central <br />location beeause tbera are people "'aeted by II <br />the: "project, both upstream and downstream. from <br />this, and this is more or less a central loca~" <br />tion, and so both projects were presented at <br />this m~eting. The notice of the public meeting, <br />although it had not indicated that we were <br />covering Cherry Creek, within the notice there <br />was a description of the planned improvement <br />on Cherry Creek." <br /> <br />"Now what was the reaction at those two <br />meetings on Toll Gate and Sand Creek?" <br /> <br />"Essentially, the reaction is that there <br />is no opposition to the plan as such. There <br />is a concern on the part of the landowners <br />in the potential reservoir sites that because <br />of a lag between the planning time and con- <br />struction, that they are going to have to take <br />a monetary loss because they are not able to <br />do anything with their lands. This was ex- <br />pressed by many speakers at the meeting, that <br />because of this period that is required be- <br />tween the time a project is proposed and con- <br />struction that they are not able then to <br />dispose of their land or plan for development <br />and this type of thing. Most of the speakers <br />requested early consideration of this matter <br />so that this matter would be cleared up. We <br />did get support from Aurora and some letters <br />from urban drainage districts in support of <br />the plan." <br /> <br />I <br /> <br />"Ben?" <br /> <br />IIYes." <br /> <br />~30- <br />
The URL can be used to link to this page
Your browser does not support the video tag.