My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02375
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:51 PM
Creation date
10/4/2006 7:14:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
Flood Section - South Platte River Floodplain Project - Right-of-Way Action
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;'lI~~- <br /> <br />- <br /> <br />Conditions for the Easement - If the easement is granted, the owner shall comply with the <br />following conditions: <br /> <br />r <br /> <br />1) TIME PERIOD - The EASEMENT shall be for a term of 25 years. <br /> <br />2) PERMITS - The owner shall be responsible for securing and monitoring all required <br />federal, state, and local permits pertaining to Colorado waters and streams. <br /> <br />3) INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and <br />shall have coverage in the amounts established by the Colorado Governmental Immunity <br />Act - part one of article 10 of title 24, lOa C.R.S., as amended. <br /> <br />4) FEE CONSIDERATIONS - A recommendation will be made that is in compliance with <br />the standard fee consideration. <br /> <br />5) RECLAMATION OF THE SITE - A reclamation plan shall be developed and provided <br />to the CWCB for approval prior to the completion of the project. <br /> <br />6) NON-EXCLUSIVE EASEMENT CLAUSE - Language will be stated in the easement <br />that will reserve the CWCB's right to grant additional easements on the same land <br />covered by this easement. <br /> <br />REQUESTED EASEMENT <br /> <br />. <br /> <br />Action Requested: <br />For the Ron Koch Company's proposed water line, an easement is requested for the construction <br />of a 6-inch water line within the CWCB project right-of way (ROW). The staff recommends that <br />the minimum width be granted for the construction of the water line. This width will be <br />determined upon the submittal of fInal construction drawings and a controlled project fIeld <br />survey. <br /> <br />RECOMMENDATION <br /> <br />Following a review by the AG's Office and CWCB staff for Agenda Items 4.b.i, a <br />recommendation is as follows: <br /> <br />Approve the easement request from the Ron Koch Company for the construction of a 6- <br />inch water supply line in a restricted right-of-way alignment within the right overbank as <br />approximately delineated on Exhibit A. Grant the authorization to the staff to prepare the <br />necessary easement documents. <br />2 <br /> <br />.' <br />
The URL can be used to link to this page
Your browser does not support the video tag.