My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02369
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:50 PM
Creation date
10/4/2006 7:14:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/24/2003
Description
WSP Section - SWSI Implementation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~/ <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />A <br /> <br />Colorado Water Conservation Board <br />Statewide Water Supply Initiative <br /> <br />Phase 4: Develop Implementation Strategies (Tasks 12-13) <br /> <br />Task 12 - Program Implementation Plan <br /> <br />Purpose <br />The purpose of this task is to develop a comprehensive implementation strategy of <br />the selected alternatives and specific projects. This effort includes identifying groups <br />of projects that when considered as a package creates greater stakeholder support and <br />funding potential than when considered individually. The Implementation Plan will <br />include institutional, funding, and regulatory compliance strategies for various <br />phases for the 30 year planning period. <br /> <br />Task 13 - Ongoing Implementation Process <br /> <br />Purpose <br />Due to the scope and scale of the SWSI, implementation will take place over an <br />extended period of time. Some projects may require significant additional planning, <br />design, and permitting effort and others may require authorization or other future <br />legislatletb The purjloseDf this t~k iB-tB ideRtify atHIDgGing p-roc-llSS- that c<m, he used <br />to track and verify implementation schedules, changing conditions, funding <br />opportunities and other factors. <br /> <br />Phase 5: Documentation (Tasks 14-15) <br /> <br />Task 14 - Develop Study Database <br /> <br />Purpose <br />An electronic database will be compiled to provide single-source documentation of <br />and access to electronic files associated with the development of the SWSI. <br /> <br />Task 15 - Study Documentation <br /> <br />Purpose <br />To compile project information and Task Memoranda into a final report to document <br />the activities and findings of the SWSI, and to guide the ongoing planning and <br />implementation process developed in the SWSI. <br /> <br />Project Management (Task 16) <br /> <br />Task 16 - CWCB Project Management <br /> <br />Purpose <br />Obtaining project management support for the CWCB is still under consideration and <br />funds will be set aside to ensure that adequate support is provided. Potential <br />activities under this task include ongoing management of project scope, schedule, <br />budget, staffing, subcontractors, and related activities (progress reporting, accounting, <br />invoicing, etc.) by CWCB. <br /> <br />DRAFT SCOPE - REVISED 3/26/03 <br /> <br />Page 6 016 <br /> <br />C:\Dccuments and SellinlJs\rb3\My OllcumentslCWCBshortSWSI Scope Draft 3.11.00.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.