Laserfiche WebLink
<br />Proiects Under Desiro <br /> <br />" <br /> <br />Excelsior Irrigating Companv - Excelsior Ditch Rehabilitation <br /> <br />e <br /> <br />Authorization: SB 97-008 <br />Water Source: Arkansas River <br />Terms of Loan: $230,000@3.75% for 30 yrs <br /> <br />County: Pueblo <br />Project Yield: 4,250 ac.ft. <br />Project Type: Ditch Rehab/Recharge Ponds <br /> <br />This $335,000 project is the re-construction of approximately 2 miles of open ditch, which <br />has previously been abandoned and farmed over. Also included in the project is the construction of <br />several pump stations for water delivery. The project is located in Pueblo County 10 miles east of <br />Pueblo. Project design is being prepared by the Pueblo Office of the Natural Resource <br />Conservation Service, Ralph Adkins, P .E. of Pueblo, Irrigation Engineering of Alarnosa and <br />Hendrooke Sprinklers of Ft. Collins. Commencement of farming operation has caused the project <br />construction to be re-scheduled to commence in September 1998 with project completion scheduled <br />for December 1998. <br /> <br />Lefthand Ditch Companv - Rehabilitation of Lefthand Vallev Reservoir <br /> <br />Authorization: liB 95-1155 <br />Water Source: Lefthand Creek <br />Terms of Loan: $370,000 @ 4.5% for 30 years <br /> <br />County: Boulder <br />Project Yield: 1,624 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />e <br /> <br />This project is the result of the State Engineer's order to increase the spillway capacity of <br />the Lefthand Valley Reservoir in order to comply with dam safety rules and regulations regarding <br />downstream structures. The project includes the replacement of the current spillway with a larger <br />roller compacted concrete spillway and stilling basin. Design engineering and Rocky Mountain <br />Consultants of Longmont, Colorado completed the permitting process. Due to unexpectedly high <br />bid prices in 1997, the Company requested and was successful in their application for additional <br />project funds from the Board at the November Board meeting. The project has been re-scheduled <br />for a September 1998 construction commencement. . <br /> <br />Minturn. Town of - Bolts Lake Dam and Ditch Rehabilitation <br /> <br />Authorization: SB 96-153 <br />Water Source: Cross Creek <br />Terms of Loan: $360,000 @ 5.25% for 30 years <br /> <br />County: Eagle <br />Project Yield: 120 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />The Town of Minturn has employed McLaughlin Water Engineers, Ltd. of Denver to <br />design the rehabilitation of the Bolt Lake Darn outlet works and supply ditch south of Minturn. <br />The project has been delayed due to complications associated with acquisition of project right-of- .. <br />way. The project has been tentatively re-scheduled for construction in late 1998. ,., <br />