My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02350
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02350
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:45 PM
Creation date
10/4/2006 7:14:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1998
Description
Summary Minutes and Record of Decisions - January 1998 Meeting - Corrected
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />20a. Floodplain Management Program - Post-Flood Activities for the 1997 Flood Events <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: Informational item; this item was not discussed. <br /> <br />21a. Instream Flow Program - Informational Items - Summary of Resolved Cases <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: Informational item; this item was not discussed. <br /> <br />21b. Instream Flow Program - Informational Items - De minimus Cases <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: Informational item; this item was not discussed. <br /> <br />21c. Instream Flow Program - Informational Items - Update on Adopt an Instream Flow <br />Monitoring Program with Trout Unlimited <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: Informational item; this item was not discussed. <br /> <br />22. Native Aquatic Species Facility - Status Report on CWCB/DOW MOU <br />Tape 3, Start/Stop: 0632 - 0769 <br />Action: Informational item; no action taken. <br /> <br />23a. Water Project Construction Loan Program - General and Financial Matters <br />-f. Tape 3, Start/Stop: 0769 - 0903 <br />Action: Informational items; no action taken. <br /> <br />24a. <br /> <br />Rio Grande Issues - Rio Grande Decision Support System - Presentation of Draft <br />Feasibility Study <br />Tape 3, Start/Stop: 0903 - 1556 <br />Action: A motion was made by David Smith to approve the draft document <br />presented, but to raise the first year budget amount from $1.5 million to $2 <br />million. The motion was seconded simultaneously by Allen Davey and <br />Janice Sheftel and approved unanimously (9-0). <br /> <br />25a. <br /> <br />Arkansas River Issues - Future Water and Storage Needs Assessment <br />Tape 3, Start/Stop: 1556 - 1593 <br />Action: This was an informational item, and was not discussed. <br /> <br />25b. <br /> <br />Arkansas River Issues - Multi-Objective Floodplain Management Study <br />Tape 3, Start/Stop: 0000 - 0000 <br />Action: This was an informational item, and was not discussed. <br /> <br />Minutes January 28-29, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.