Laserfiche WebLink
<br />Agenda Item 26b <br />November 16, 1998 <br />Page Two <br /> <br />Discussion <br /> <br />The replacement program has been used thus far to replace DCPs in Divisions 1,2,3,5,6, <br />and 7. The requested funds will be used to replace about fifteen more DCPs in Division 1 and 2. <br />About 60 DCPs remain for future replacement in Divisions 1 and 2. <br /> <br />Controlled maintenance of the satellite monitoring system is an authorized non-reimbursable <br />expense from the Construction Fund (Section 37-60-121 (1)(b)(lI), CRS), and it is included in the <br />Board's Long-Term Financial Projection. Staff recognizes the need to continue collection of real- <br />time stream flow data and the benefits to the Board's Instream Flow Program. <br /> <br />Recommendation <br /> <br />Staff recommends that the Board request the General Assembly authorize up to $120,000 <br />from the Construction Fund to be appropriated to the Department of Natural Resources for allocation <br />to the State Engineer in FY 99-00 for maintenance of the satellite monitoring system. <br /> <br />Attachment <br /> <br />W:\BOARDMEM\NOY98\29b - Satellite.doc <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />. <br />