My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 12/03/1981
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
Board Meeting 12/03/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:37 PM
Creation date
10/4/2006 7:13:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
12/3/1981
Description
Agenda, Minutes, Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />first step should be to request assistance from the Bureau of <br />Reclamation in examining selected aspects of the West Divide <br />project (see attached letter). I will report back to the Board <br />at the February or April meeting on the results of this analysis. <br /> <br />(2) A feasibility study of the Grand Mesa project, to <br />include consideration of financing problems, has been initiated <br />(see agenda item lOb). <br /> <br />(3) The Fruitland Mesa project is presented for the Board's <br />consideration for funding (see agenda item 7c). <br /> <br />(4) Front-end cost-sharing is proposed for the Narrows and <br />Animas-La Plata projects (see agenda item 7b). <br /> <br />(5) The proposed five year capital investment budget (see <br />agenda item 8) includes funding for the West Divide, San Miguel, <br />Grand Mesa, and Fruitland Mesa projects and front-end <br />cost-sharing for the Narrows and Animas-La Plata projects. <br /> <br />(6) The proposed capital investment budget also includes a <br />category for financing the repair of projects with dam safety <br />problems. In addition, three of the projects presented for the <br />Board's consideration under agenda item 7c are dam repair <br />projects, two being from the State Engineer's list of high <br />priority projects. <br /> <br />(7 ) <br />financing <br />item 7a). <br /> <br />The staff has reviewed and analyzed existing state <br />mechanisms and the issues associated therewith (see <br /> <br />The <br />Board so <br />meeting. <br /> <br />staff will address these matters further should the <br />desire based upon its deliberations at the December <br /> <br />JWM/gI <br /> <br />Attachment <br /> <br />-2- <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.