My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02312
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:33 PM
Creation date
10/4/2006 7:13:52 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2001
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />This $270,000 project is the rehabilitation of the Summit Reservoir Dam outlet works and the repair and improvements <br />to the Summit Reservoir and Irrigation Company's water collection and distribution facilities. The Cortez office of <br />Natural Resource Conservation Service prepared the construction plans and specifications. Construction for the <br />second to the last phase of improvements commenced in March of 1999, by Noland, Inc., of Mancos, CO., and was <br />completed in July of 1999. The final phase of the project has been designed and is currently under construction. The <br />project is anticipated to be complete by January of 2002. <br /> <br />Proiects Under Desil!n <br /> <br />I. Rvan Gulch Reservoir Companv Rvan Gulch Dam Rehabilitation <br /> <br />Authorization: SB 99-173 <br />Water Source: Big Thompson River <br />Terms of Loan: $317,500 @4.25% for 30 years <br /> <br />County: Larimer - S. of Loveland <br />Project Yield: 645 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of the Ryan Gulch Dam which includes the construction of a new spillway, lining the <br />upstream face of the dam with a clay liner, sleeving the existing 24-inch outlet pipe, and constructing a new upstream <br />controlled inlet works. Boyle Engineering, Inc. of Denver has completed the final design plans, which has been <br />reviewed and approved by the State Engineer's Office. Bids were received to construct the planned improvements, but <br />were outside the project budget. The Ditch Company is currently obtaining a new design engineer to redesign certain <br />aspects of the project in an attempt to reduce the overall cost of the job. The project is currently on-hold pending the <br />outcome of the Ditch Company's redesign of the reservoir. <br /> <br />2. People Ditch Companv People Ditch Diversion Structure Rehabilitation <br /> <br />e <br /> <br />Authorization: Small Project Loan <br />Water Source: South Platte River <br />Terms of Loan: $43,000 @3.75%for20years <br /> <br />County: Logan - N.E. of Sterling <br />Project Yield: 1,200 ac.ft. <br />Project Type: Diversion Structure <br /> <br />The People's Ditch Company historically diverted irrigation water from the South Platte River at an existing diversion <br />point located approximately 6 miles northwest of the Town of Sterling. This existing diversion structure was <br />damaged during the flood of 1995 and was entirely washed out in 1997. The proposed project is to construct a new <br />diversion structure along the Bravo Ditch, therefore eliminating the need for the existing structure, and then construct <br />approximately 1050 I.f. of 24" pipeline to transport the flow from the Bravo Ditch back to Peoples Ditch. Bravo <br />Ditch has agreed to allow People Ditch to convey their decree flows through their ditch system and then divert it back <br />to the existing People Ditch by means ofthe new diversion structure. The project is tentatively on-hold pending <br />resolution of some specific loan contract requirements. <br /> <br />3. Loveland. City of Green Ridge Glade Reservoir Rehabilitation <br /> <br />Authorization: HB 98- I I 89 <br />Water Source: Big Thompson River <br />Terms of Loan: $5,000,000 @4.75% for 10 yrs. <br /> <br />County: Larimer - W. of Loveland <br />Project Yield: 6,000 acre feet <br />Project Type: Dam enlargement <br /> <br />This $19.2 million project is the enlargement of the Green Ridge Glade Reservoir northwest of Loveland. The project <br />consists of raising the crest of the existing dam approximately 60 feet, construction of a new concrete labyrinth weir <br />spillway, and new multi-level intake gate tower outlet structure. The City has contracted with Woodward-Clyde of Denver <br />to prepare the fmal design and construction contract documents. Environmental studies have been complete and the City is <br />currently in the process of obtaining the necessary permits to realign the adjacent County Road. The design is scheduled <br />to be complete by February of2002, with construction to follow in June of2002. <br /> <br />e 4. Riverside Reservoir and Land Companv - Riverside Reservoir Spillwav Rehabilitation <br /> <br />Authorization: SB 98- I 189 <br /> <br />County: Weld - NW of Wiggins <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.