<br />Director's Report Attachment - November 19-20, 2001, Board Meeting <br />Water Supply Planuing aud Finance Section <br />Design and Construction Status Report <br /> <br />The CWCB Water Supply Planning and Finance Section has Completed 6 projects in FY 01-02. Currently we have 10 <br />projects under construction and 17 projects in the design phase, . <br /> <br />The attached spreadsheet summarizes project status including budget construction schedule, and progress to date. During <br />this current reporting period 2 projects were completed. <br /> <br />The attached progress report briefly outlines all active project design and construction information and progress to date. <br /> <br />Projects Under Construction <br /> <br />1. Ute Water Conservancv District - Plateau Creek Pipeline <br /> <br />Authorization: SB 88-30 <br />Water Source: Grand Mesa Drainage <br />Tenus of Loan: $27,600,000 @ 5% for 30 years <br /> <br />County: Mesa - E of Palisade <br />PrOject Yield: 7,200 adt. <br />Project Type: Pipeline Construction <br /> <br />. <br /> <br /> <br />This $55,000,000 project ia the replacement of an existing 15-mile pipeline providing water to the Ute Water Conservancy <br />District. The District provides water to 55,000 people, or mor~ thaIi half of the Grand Valley population. Camp, Dresser, <br />& McKee, Inc. of Denver has completed final design and construction contract documents for Phase IT of the project. <br />Phase I of the project, placement of the lower 8,000 linear foot of the pipeline, commenced in February by ERS <br />Constructors, Inc. of Sedalia, CO. and was completed in May 19991 Phase IT involves the installation of 26,000-fl. of 48" <br />waterline pipe, 29,500-ft. of 54" waterline pipe, and the constructioh,' of l3,500-ft. of 10' diametet tunnel. A joint venture A <br />between Barnard Construction, Inc. of Bozeman, Montana an<l Affholder Construction, Inc. of Chesterfield, Missouri was .. <br />awarded the construction contract for Phase II, at a cost of $44,000;000. Construction of Phase IT commenced in <br />December 1999 and is approximately 95% complete. The project is tentatively scheduled for completion in January of <br />2002. <br /> <br />2. Consolidated Mutual Water Companv - Fortune Reserv()ir Dam Construction <br /> <br />Authorization: SB 99-173 County~ Jefferson - NW of Arvada <br />Water Source: Clear Creek Project;Yield: 10,000 ac.ft. <br />Terms of Loan: $20,600,000 @5.50% for 10 yearsproject TYj)e: New Dam Construction <br /> <br />This $30,000,()00 project is the construction of a new 9,000 acre-foot reservoir northwest of Arvada. The project consists <br />of a 105-foot high, zoned earth embankment, Probable MaxhnumFlood emergency spillway, with a 30-inch diameter <br />outlet pipe. Tuttle-Applegate, Inc. of Denver and CTLfI'hompson completed the final design plans, which have been <br />reviewed and approved by the State Engineer's Office. The consttuction contract was awarded to R.E. Monk from <br />Colorado Springs, Colorado, at a contract price of $15,000,000. the distribution pipeline from the dam to the Company's <br />treatment plant commenced construction in October 1999 by C011)pany forces. R.E. Monk commenced construction in <br />March of 2000, with project completion scheduled for March of2\)02. The project is approximately 80% complete. <br /> <br />3. Idaho Springs, Town of Idaho - Idaho Springs Reservoir Rehabilitation <br /> <br />Authorization: HB 98-1189 <br />Water Source: Chicago Creek <br />Tenus of Loan: $1,165,000 @4.75%for 10 yrs. <br /> <br />County: Larimer - S. ofldaho Springs <br />Projeqt Yield: 230 acre feet <br />Project TYpe: Reservoir Rehabilitation <br /> <br />In 1998 the State Engineer's Office restricted the storage height <lfthe reservoir to be 9-ft. below the crest ofthe dam, <br /> <br />25 <br /> <br />.e <br />