Laserfiche WebLink
<br />with respect to the proposed Stagecoach Reservoir project, <br />the staff has concluded that the project study is incomplete in <br />some respects. In part icular, we feel that there is a need for <br />additional data on alternative dam designs since that may affect <br />cost estimates by as much as $1 million. Under the <br />circumstances, I recommend that the Board not act on the proposed <br />project at this time. <br /> <br />Recommendations <br /> <br />I recommend that the Board: <br /> <br />(1) Recommend to the General Assembly that these six <br />projects be authorized for construction under the terms and <br />conditions specified in each project summary, and <br /> <br />(2) Recommend to the General Assembly the following <br />priorities for the subject projects: <br /> <br />1. Buckeye Reservoir <br />2. Hyannis Peak Dam <br />3. Hertha Reservoir <br />4. Fuchs Ranch Dam <br />5. Great \'/estern Dam <br />6. Harper Lake Reservoir <br /> <br />JWM/gl <br /> <br />MEMORANDUM <br /> <br />-2- <br /> <br />1/3/83 <br />